The potential of labour-intensive construction methods in the provision of urban infrastructure

Du Toit, G J (1997) The potential of labour-intensive construction methods in the provision of urban infrastructure. PhD thesis, University of Pretoria, South Africa.

Abstract

In present-day South Africa, the provision of urban infrastructure falls within the realm of socio-economic development. No longer is only the physical provision of infrastructure of importance, but also the upliftment of the beneficiary communities. Labour-intensive construction techniques, with its larger employment multiplier, lower capital requirements and larger direct community interaction, are hailed as one of the solutions. The purpose of this thesis is, firstly, to investigate the practicality and feasibility of applying labour-intensive construction techniques on a large scale in the provision of urban infrastructure, and secondly, to determine criteria to be considered for the choice of a construction method. The research indicated that currently most labour-intensive Africa construction approaches are economically inefficient, fail to enhance sustainable socio-economic development and are more expensive than conventional construction approaches. There is a direct relationship between the degree of increase in the labour component of a construction process, and the increase in the total cost. This is due to low labour productivity, wage rates at levels which cannot compete with plant productivity, additional management supervision and a higher perceived risk associated with it. For South Africa's future economic well-being and to combat unemployment, civil engineering construction will have to become more labour absorbent in nature. The study highlighted that this can be done within the limitations of economic efficiency and long term sustainability. Labour-intensive construction of municipal infrastructure should be linked to a national development and growth strategy with central government proactively taking the lead and providing institutional and financial support. To achieve this, the construction of urban infrastructure should not be approached as a special employment programme, but primarily, as the efficient provision of services to communities and, secondarily, as the optimisation of the development impact. It would require that labour utilisation in the construction process be enhanced and optimised, but with due cognisance of cost implications, balanced capital/labour input ratios as well as the socio-economic efficiency and sustainability thereof.

Item Type: Thesis (Doctoral)
Thesis advisor: Smith, R A F and Visser, A T
Uncontrolled Keywords: South Africa; civil engineering; construction method; economic development; employment; government; labour productivity; optimisation; productivity; supervision; sustainability; unemployment; urban infrastructure
Index terms: productivity, employment, falls, efficiency, Africa, interaction, supervision, labour productivity, strategy, programme, urban infrastructure, construction method, economic development, labour utilization, South Africa, unemployment, well-being, construction process
Subjects: management, health risk and incident analysis, performance management, infrastructure and transport systems, project controls, control systems, mental health and wellbeing, regions and continents, Geography, economic development, behavioral psychology, building construction, economic analysis
Topics: Research Practice, Business Strategy, Time Control, Site Management, Human Resources, Urban Studies, Sustainability, Geographical Context, Project Management, Health and Safety, Quality Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here