George, K M (2019) Key performance indicators' effects on public sector infrastructure project efficiency in Grenada. DPA thesis, Walden University, USA.
Abstract
Grenada is 1 of 15 developing countries in Caribbean Community known as CARICOM. The infrastructure capital projects in these developing countries are plagued with an array of issues: unethical practices, inadequate supervision, lack of transparency and accountability, inadequate monitoring and evaluation, cost overruns, and inefficiencies. In the 1980s and 1990s, the International Monitory Fund and World Bank introduced a balanced scorecard engineered under the structural adjustment program, but it was unable to improve infrastructure project efficiencies. This qualitative case study sought to understand the role of management key performance indicators (KPIs) on public sector infrastructure capital project efficiency on the island of Grenada. An institutional assessment and development framework and a classical management theoretical framework methodology were used to explore the effects of management KPIs on public sector infrastructure capital projects efficiencies in developing countries. The research incorporated a constructivist philosophy that underpins the evaluation and perception of the government, the National Water and Sewerage Authority (NAWASA), project teams, systems, and stakeholders. A purposive sampling strategy with elements of snowballing was used to obtain 12 representative participants for interviews, and a systematic approach of transcribing, coding, and thematic analysis was done. Findings indicate inadequacies in the BSC performance measure system on infrastructure projects, which justifies the use of comprehensive management KPIs. Positive social change implications of this study include recommendations for comprehensive management KPIs and policies to improve public sector infrastructure project efficiency in Grenada.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Saye, L |
| Uncontrolled Keywords: | Grenada; accountability; case study; developing countries; government; infrastructure project; key performance indicators; monitoring; philosophy; public sector; supervision; thematic analysis |
| Index terms: | Caribbean, developing country, interview, performance measure, strategy, philosophy, accountability, methodology, program, thematic analysis, efficiency, balanced scorecard, key performance indicator, case study, cost overrun, public sector, World Bank, Grenada, capital project, monitoring, purposive sampling, infrastructure project, unethical practices, project team, transparency, supervision |
| Subjects: | liability law, development economics, Geography, research methods, physical geography and landforms, strategic project management, ethical practice, infrastructure and transport systems, philosophical studies, administrative law, professional development, methods and analysis, performance management, software systems, performance measurement, management, project delivery, financial and cost management, institutional frameworks, control systems, data collection methods |
| Topics: | International Construction, Digital Applications, Site Management, Information Management, Research Practice, Cost Management, Business Strategy, Governance, Quality Management, Legal Issues, Engineering Principles, Geographical Context, Project Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here