Isa, M F M (2013) Quality modeling and improvement of university facilities services using six-sigma: A case study on wayne state university FPM services. PhD thesis, Wayne State University, USA.
Abstract
Literature survey shows that there is no published information concerning the investigation and/or evaluation (by the customer) of the services provided by universities facilities management units, and no previous research was done to measure and evaluate such services to address, identify, and model the critical factors affecting quality. This research work proposed a service quality model relating factors affecting quality of services provided by facility management units at higher educational institutions to the customer perception of service quality. It also examined the use of the Six-Sigma DMAIC methodology as an improvement strategy for services provided by facility management units at higher education institutions. Based on the service quality model developed and using a tool box of Six-Sigma methods, a case study at Wayne State University (WSU) was performed to examine and improve the facilities services for. A large scale survey was used as an instrument to measure customer satisfaction with the services delivered. The customer ratings for services showed that some service categories needed improvement. The initial service quality model was devised by surveying the literature, as well as conducting in depth interviews with people in the FM field at different levels of management hierarchy. The model was reviewed, refined, modified, and validated by conducting a Nominal Group Technique session, which led to a final proposed service quality model for higher education institutions. A set of Six-Sigma tools and techniques were utilized through different phases of the service process improvement, and to conduct an improvement process for the selected service category of General Improvement Request Form (GIRF). These tools and techniques included process map, Pareto charts, cause and effect matrix, and Failure Mode and Effect Analysis (FMEA). A modified process map was developed to avoid bottlenecks, and eliminate non-value adding activities. Critical tasks affecting process outputs were identified through Cause and Effect Matrix, and all Key Process Input Variables (KPIVs) were rank ordered with respect to the importance of the output variable. Potential failure modes, failure effects, and causes of failure were identified through FMEA. A risk Priority Number (RPN) was assigned for each potential failure mode, and recommended actions to eliminate and control failure modes were developed in this process.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Usmen, M A |
| Uncontrolled Keywords: | case study; education; facilities management; failure; higher education; service quality; university facilities |
| Index terms: | higher education, strategy, investigation, facilities management, failure mode, surveying, higher education institution, customer satisfaction, modelling, methodology, case study, survey, university facility, interview, service quality, process improvement, quality of service, critical factor |
| Subjects: | public and environmental health, construction type, educational institutions, health monitoring assessment and metrics, service delivery, research methods, analytical methods, performance measurement, reliability engineering, risk assessment, management, data collection methods |
| Topics: | Health and Safety, Quality Management, Research Practice, Construction Technology, Risk Management, Engineering Principles, Stakeholder Management, Education, Business Strategy |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here