Welcoming high reliability organising in construction management

olde Scholtenhuis L L, D A G (2013) Welcoming high reliability organising in construction management. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Abstract

To achieve project objectives, construction project managers have to manoeuvre through complex coordination structures. They have to simultaneously deal with limited budgets, tight schedules, demanding stakeholders and a fragmented supply-chain. Despite their extensive coordination efforts, project managers are frequently confronted with unexpected delays that force them to improvise and re-plan. As a consequence, budgets and schedules tend to overrun and project organisations appear out-of-control rather than stable and reliable. To enrich our understanding of these phenomena, we propose using the theoretical lens of High Reliability Organising (HRO). HRO stems from research into high hazard industries, and is relatively new to construction management. It provides five generic guiding principles that help practitioners anticipate and contain unwanted events. Given that the use of HRO beyond high hazard contexts is not universally accepted within the scientific community, we ask whether it is justified to apply the HRO lens to the organisation and coordination of 'mainstream' construction projects. We elaborate on this issue by addressing its main theoretical concepts, its origin and its application beyond the fields of risk and safety. We further explain why reductionist interpretations of HRO concepts unnecessarily limit HRO’s research domain. We propose a pragmatic reinterpretation of HRO that provides access to the field of construction management. Finally, we present preliminary results of our study into delays and overruns in inner-city subsurface utility reconstruction projects. Our theoretical and empirical arguments provide a stepping-stone for future HRO research projects in the construction management field.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: organisation; productivity; project management; reliability; mindfulness
Index terms: reconstruction, coordination, project organization, construction project, productivity, mindfulness, manager, practitioner, overrun, project management, project manager
Subjects: practitioner, profession, health conditions and diseases, project controls, organizational theory, building construction, project management theory and practice, production management, management
Topics: Engineering Principles, Organizational Design, Research Practice, Roles and Professions, Time Control, Business Strategy, Project Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here