Melia, K (2005) Exploring and modelling the process of change management in construction organisations. PhD thesis, University of Dundee, UK.
Abstract
The pressures to adapt to change are as high in the construction industry as in any other industry. The literature review highlighted the main challenges facing the industry at present e. g. fragmentation and adversarial relations. To say that the industry has made no attempt to tackle the problems is misleading. Numerous initiatives were established in the wake of the Latham (1994; 2001) and Egan reports (1998). Whilst admirable, the initiatives are not designed to tackle problems associated with the business level, for example poor business management processes. In the author's view greater attention needs to be paid to resolving the problems that are within the control of the organisations, namely those at the business level because improvements in efficiency nada the way that they operate as businesses have the potential to improve the way the way that they interact and operate at the project level (the business and project levels do not operate in isolation and the problems associated with one level can have an impact upon and affect the other). The literature review highlighted the low level of research in the field of business process improvement in relation to construction supply chain organisations. In light of the need for change and the gap in existing knowledge, the research focused on investigating whether construction organisations have a verifiable change process (determined via process mapping), investigating the management of the pillars of change management (factors that support the change process) and the development of a model to assess change capability. The findings demonstrated that the case study organisations do have a verifiable change process but none recognised the need to incorporate the pillars into the process.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | case study; change management; construction supply chain; fragmentation |
| Index terms: | modelling, construction industry, construction supply chain, low level, Latham, case study, efficiency, construction organization, business management, mapping, literature review, change management, fragmentation, process improvement |
| Subjects: | management, performance management, industry analysis, measurement and scaling, construction logistics, data collection methods, business, data analysis and analytics, spatial and geospatial analysis, industry policy reports, organization, analytical methods |
| Topics: | Governance, Research Practice, Business Strategy, Organizational Design, Engineering Principles, Supply Chain Management, Quality Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here