Ramos, M A P (2023) Determining factors and strategies to promote construction and demolition waste management on a local scale. PhD thesis, Universidade NOVA de Lisboa, Portugal.
Abstract
Construction and demolition waste (CDW) management has attracted growing interest amongst the research community, especially in terms of the implementation of circular economy principles in the construction sector, mainly due to the large amount of waste generated. The problem has been explored through different approaches and in various contexts, but knowledge gaps persist within the study of proximity dynamics. Therefore, this research project focuses its analysis on the study of behaviour change in CDW management on a local scale, converging on the role of municipalities and micro and small construction companies, from an operational perspective. For this, research questions were formulated related to the study of the determining factors for CDW management on the local scale; with the deepening of knowledge regarding the reality of illegal dumping of CDW, which is a problem involving the identified stakeholders; and with the implementation of intervention strategies to promote the improvement of the management of this waste stream. The research project approached the topic in a transdisciplinary way, selecting different research methods, including a literature review, a survey by questionnaire, workshops, and fieldwork, as a way to integrate different realities, with different approaches, contributing to the adaptation of research tasks, but also leaving a more solid research contribution for researchers, technicians, policy-makers and authorities. In terms of results, there are determining factors for CDW management that are common to municipalities and to micro and small construction companies, such as the lack of proximity facilities and equipment for the waste management generated, or the need to address knowledge gaps. On the other hand, the size of construction companies is a determining factor, with micro and small construction companies presenting specific constraints, and municipalities above all identifying the need for cooperation between entities as a key factor. Illegal dumping is still a problem that results from the constraints identified, and one which is of particular importance from both the point of view of the behaviour of abandonment, and the loss of resources, but also because of the cost of cleaning actions for municipalities. At the level of the intervention strategies tested, local CDW management facilities and a proximity approach involving the municipal technicians and representatives of construction companies, or applicants for processes, can lead to very favourable results, with direct implications for behaviours acquired over time, and also in cost reduction. However, all these strategies must be accompanied by robust and frequent capacitation, training and supervision actions.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | da Graça Martinho, M |
| Uncontrolled Keywords: | circular economy; cleaning; equipment; policy; research methods; supervision; training; waste management; workshops |
| Index terms: | cost reduction, municipality, cooperation, construction sector, waste management, questionnaire, stream, survey, construction company, intervention strategy, abandonment, strategy, construction and demolition, literature review, behaviour change, cleaning, supervision, implementation, dynamics, adaptation, circular economy, workshop |
| Subjects: | control systems, data collection methods, data analysis and analytics, water management, economics, management, systems engineering, industry analysis, administrative law, waste management, user focus, organization, construction type, contractual arrangements, psychology, financial risk, sustainable design, maintenance engineering, completion, behavioral psychology |
| Topics: | Organizational Design, Design Practice, Construction Technology, Research Practice, Cost Management, Business Strategy, Legal Issues, Procurement, Sustainability, Project Management, Engineering Principles |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here