Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.
Abstract
Delay to projects is one of the foremost concerns of the construction industry in the United Arab Emirates. The delays to the projects are affecting the economies throughout the world. Delay to projects mean the slowdown of development in all other related fields. The main aim and objective of this dissertation is to evaluate the various types of delays and the reasons for those delays that are currently affecting the projects in the United Arab Emirates. Measures from previous researches to reduce or eliminate these delays by methods of mitigation or acceleration are analyzed for the case studies considered for this research. There are various types of delays which are identified. It is important to identify whether the delay is critical or not as identification of critical delays helps in taking appropriate measures at the correct time. The delay may be non excusable (contractor caused) for which the client and the consultant need to have project management tools to effectively manage the delays or compensable (client caused) delays which are due to the client. The delays may be by either parties and can be concurrent. The reasons for delays are primarily due to an unreasonable project scope, inadequate early planning and the absence of risk management systems. The contractor further contributes to delay due to lack of resources and labor productivity. Over ambitious estimates, incorrect task assessment ,lack of task clarity, design/ approval delays and interference in the decision making process by the client add on to the delay. Research done earlier indicates that “changed work complicates a project and invites delays” ( Molner , 2007). Delays that are non excusable (contractor caused) “expose a contractor to delay claims of its subcontractors and liquidated damages” ( Schumacher , 1995 ). Delays that are compensable (owner caused) need the support of specialty contractors who need to be nominated at the appropriate time ( Gil , 2001 ). The mitigation of delays was discussed by application of knowledge management and project learning. The lessons learnt feedback gives important information related to the mitigation measures considered for implementation. The prevention of delay can be done through mitigation and/or acceleration. It is important to plan/analyze the requirement in detail. This has been done by identifying the risks and mapping resources. The estimation and allocation of works was done to modularize the works and any issues likely to delay the works can be escalated for decisions and discussion. A detailed case study has been carried out for three projects in the United Arab Emirates. The first case study deals with a project which encountered delays and implemented measures of mitigation and acceleration to reduce the delays. The second case is a project which failed in its objectives of completion in time as well as budget. The third case is success project, where in spite of initial delays the project was completed on time by implementing mitigation and acceleration measures. The methodology implemented is acquisition of key data and justifying by providing adequate reasons regarding the data. Results and analysis for the case studies were structured according to methodology and further detailed into planning, resource, cost and nominations analysis.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Randeree, K and Pinnington, A |
| Uncontrolled Keywords: | United Arab Emirates; case studies; case study; client; consultant; decision making; feedback; knowledge management; learning; liquidated damages; owner; productivity; risk management |
| Index terms: | project scope, labour productivity, risk management, estimate, implementation, prevention, construction industry, dissertation, acceleration, project management, case study, owner, productivity, decision-making process, acquisition, specialty contractor, estimation, mapping, methodology, decision-making, mitigation, United Arab Emirates, knowledge management, subcontractor, approval, liquidated damages |
| Subjects: | spatial and geospatial analysis, research methods, financial risk, Geography, contractual remedy, contractual role, research dissemination and communication, scope management, practitioner, contractual arrangements, professional practice, management, project management theory and practice, professional development, decision analysis, sociology, project controls, industry analysis, business, risk assessment, data collection methods, financial and cost management |
| Topics: | Time Control, Contract Administration, Site Management, Information Management, Research Practice, Business Strategy, Cost Management, Stakeholder Management, Roles and Professions, Engineering Principles, Project Management, Geographical Context, Procurement, Risk Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here