A logistics framework for improving construction supply chain performance

Thunberg M, P F (2013) A logistics framework for improving construction supply chain performance. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Abstract

In recent years, attention has been placed on the logistics activities in construction projects in order to reduce total costs. The construction industry is experiencing poor productivity, resulting from an inability of contractors, subcontractors, and suppliers to cooperate efficiently. Research on logistics in construction lacks a holistic perspective and tends to focus on one activity at a time. This research presents the Builder’s SCOR model (BSCOR) to be used for logistics improvements in construction. The model is based on the Supply Chain Operations Reference Model (SCOR model) covering the total supply chain. The BSCOR model is empirically derived through five case studies at different construction sites over a period of five years. This has resulted in a model covering the activities Source, Build, and Plan, that describes the flow of materials to and on the site and how ownership passes to the client. With the BSCOR model, contractors can map the material and information flows between supply chain members with standardized process definitions. It is also possible to precisely measure the supply chain performance and to know where to put improvements efforts. The main intention with the BSCOR model is to help the industry reduce costs and increase productivity.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: control; logistics; measurement
Index terms: case study, construction site, productivity, builder, information flow, construction project, construction supply chain, ownership, supply chain performance, construction industry, subcontractor
Subjects: work location, construction logistics, supply chain performance, practitioner, data collection methods, industry analysis, information systems, production management, management, economics
Topics: Supply Chain Management, Digital Applications, Organizational Design, Site Management, Project Management, Research Practice, Business Strategy, Roles and Professions
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here