Smith, I G N (1995) Rainfall patterns and the acceptability of soils for earthworking. PhD thesis, Heriot-Watt University, UK.
Abstract
During earthworking on roadworks, the use of high quality imported fills is expensive. In cases where thousands of cubic metres of fill are required, the costs can be vast. It follows then, that it is economically advantageous to make maximum use of the materials occurring on site and keep imported fill requirements to a minimum. However, this will only be possible if the excavated (on site) material is in an acceptable state. A system has been developed to help improve the methods and procedures for the planning and cost control of earthworking on trunk road contracts in Scotland. This has been achieved by the development of a computer-based system for forecasting the acceptability of soils for earthworking, from ground and meterological data. The system advises on the best times of the year for earthworking at particular geographical locations, in terms of the likelihood of soils being excavated in an acceptable state. Additionally, the system advises on the likelihood of unacceptable or acceptable conditions being encountered once a contract has started. Output from the system can be considered during the planning, design and execution of the earthworks to aid the overall cost-effectiveness. The system, implemented as two computer programs, has been successfully validated through a full-scale trial and is ready for release to the industry. The potential benefits of the system to the construction industry are immeasurable. Significant cost savings through improvements in earthworking efficiency are possible through the controlled use of the system. Additionally, the work has raised concerns about the current practice for interpreting MCV test results and a call for investigating this important issue is made. (DXN002450)
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | cost control; earthworks; forecasting |
| Index terms: | cost saving, construction industry, Scotland, computer program, efficiency, forecasting, cost control, rainfall, cost-effectivenes, earthwork |
| Subjects: | Geography, construction methods, climate science, industry analysis, performance management, economics, software systems, prediction and forecasting, financial and cost management |
| Topics: | Digital Applications, Research Practice, Cost Management, Quality Management, Sustainability, Engineering Principles, Geographical Context |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here