Identifying early warning signs of construction labor shortages

Shiha, A and El-adaway, I H (2025) Identifying early warning signs of construction labor shortages. Construction Management and Economics, 43(10), pp. 765-793. ISSN 0144-6193

Abstract

Construction labor shortages constrain project-level objectives and national development plans. The goal of this study is to utilize the lagged effects of macroeconomic conditions as early warning signs of construction labor shortages. To this end, the authors adopted a methodology, encompassing (1) retrieval of publicly available data and preprocessing of construction labor shortage as the target variable and macroeconomic measures as the explanatory variables, (2) identification of short-term associations between shortages and economic cycles using the Granger causality test, (3) examination of long-term relationships between labor shortages and economic conditions using the Johansen cointegration test, and (4) estimation of the impacts of economic conditions on labor shortages using the fixed-effects models. Results show that in the United States and Canada, interest rates and exports are the most significant leading indicators of construction labor shortages, with lags ranging from 12 to 15 months. Panel data analysis in the European Uinon and the United Kingdom reveals that a 1% increase in imports and building permits leads to increases in construction job vacancies by 1.19 and 0.63%, respectively, five quarters later. Findings highlight that by analyzing lagged macroeconomic indicators, construction practitioners can leverage the timely prioritize the strategies to mitigate labor shortages.

Item Type: Article
Uncontrolled Keywords: construction labor shortages; econometrics; economic cycles; panel data analysis
Index terms: econometric, export, strategy, Granger causality test, economic cycle, cointegration, construction labour, estimation, United States, import, economic indicator, labour shortage, United Kingdom, construction practitioner, shortages, economic condition, data analysis, methodology, vacancy, early warning, Canada, interest rate
Subjects: management, business management, financial risk, economic analysis, professional development, factor and component analysis, real estate economics, data analysis and analytics, research methods, Geography, economics, financial and cost management
Topics: Research Practice, Cost Management, Business Strategy, Geographical Context, Site Management, Urban Studies, Information Management, Supply Chain Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here