A decision support system for optimizing labor acquisition in construction

Jaiswal, S and Kar, S (2025) A decision support system for optimizing labor acquisition in construction. Journal of Construction Engineering and Management, 151(12): 04025211, ISSN 0733-9364

Abstract

The construction industry has been criticized for poor team coordination, a crucial factor in effective project delivery. Integrating design data, construction schedules, and labor acquisition can enhance coordination among design, planning, and procurement teams, reducing labor-related issues and improving productivity. An integrated and optimized labor management system can ensure the smooth and efficient acquisition of labor. However, limited research addresses these aspects comprehensively. Previous studies neglected the integration of building information modeling (BIM) with labor acquisition, overlooked optimization of labor release/rehire and idling costs, and lacked dynamic coordination among design, planning, and procurement teams. Limited studies have addressed labor retention thresholds, location-adjusted costs, or multiobjective optimization for workforce management. This study proposes a decision support system (DSS) that integrates design data and construction schedules while optimizing labor acquisition. The DSS utilizes a custom integration developed by the authors between Revit version 2023 and Primavera P6 Professional 22 to facilitate 5-dimensional (5D) BIM. A multiobjective optimization model based on the nondominated sorting genetic algorithm II (NSGA-II) was developed to balance labor release and rehiring, idling, peak labor demand, and overall labor costs. The output of the DSS was visualized using a custom C# application that showed the optimized labor acquisition plan to the end user. The DSS was validated through a building project, where it reduced labor fluctuations by 19.75% and labor costs by 0.19% compared with the actual project schedule. It also outperformed Primavera P6, reducing labor fluctuations by 10.96% and costs by 0.55%, and lowering peak daily labor demand by 7.03% compared with the original plan and 11.85% compared with Primavera P6. By integrating BIM, construction scheduling, and optimization, the DSS offers a cost-effective, dynamic labor acquisition system. It enables practitioners to engage laborers efficiently, minimizing idling and hiring gaps, ultimately ensuring timely project completion within budget.

Item Type: Article
Uncontrolled Keywords: building information modeling; construction schedule; decision support system; labor acquisition; labor productivity; optimization
Index terms: acquisition, productivity, management system, end user, construction scheduling, building information modelling, genetic algorithm, labour cost, project delivery, construction industry, retention, coordination, decision support, labour productivity, practitioner, integration
Subjects: business, project delivery, algorithms, stakeholder, organizational analysis, cost management, practitioner, decision analysis, industry analysis, management, information systems, project controls
Topics: Research Practice, Risk Management, Site Management, Procurement, Time Control, Business Strategy, Organizational Design, Human Resources, Roles and Professions, Digital Applications
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here