Investigation of risk management and uncertainty in Athens 2004 Olympic games: The Equestrian Centre case study

Anagnostou, E (2005) Investigation of risk management and uncertainty in Athens 2004 Olympic games: The Equestrian Centre case study. PhD thesis, University College London, UK.

Abstract

The dissertation has as a main objective to investigate the Risk management and uncertainty during the construction phase of the Athens 2004 Olympic Games. A review of previous Olympic Games is undertaken, but also projects that were of significant value to the world and especially Europe like the Channel Tunnel, the Millennium Dome and the Wembley stadium. This 'comparison' intends to investigate how risk appears in everyday megaprojects and how it can be managed or even avoided. The study concentrated on the Olympic Equestrian centre, but studies and comments on some other Olympic projects in Greece as well through the analysis. Interviews were a powerful tool of the analysis as important outcomes and thoughts came out of them. The dissertation concludes with comparison on risks and uncertainty in Olympic projects and all those learned from the literature review, so that the reader can have an idea how really matters are dealt with in the real construction world. London 2012 Olympic Games is on their way, so hopefully this dissertation will be useful to what English companies should be aware of during constructing the venues. Key Words: Risk Management, Uncertainty, Optimism Bias, Athens 2004 Olympic Games, Megaprojects.

Item Type: Thesis (Doctoral)
Index terms: Olympic Games, megaproject, literature review, Greece, interview, tunnel, optimism bias, dissertation, construction phase, London, risk management, investigation, Europe, case study
Subjects: research dissemination and communication, strategic project management, physical geography and landforms, Geography, cognitive psychology, risk assessment, data collection methods, data analysis and analytics, project delivery, sociology, infrastructure and transport systems
Topics: Project Management, Geographical Context, Engineering Principles, Risk Management, Research Practice, Urban Studies
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here