Enhancing project portfolio selection for construction holding firms: A multi-objective optimization framework with risk analysis

Ghanbari, M; Olaikhan, A A J and Skitmore, M (2025) Enhancing project portfolio selection for construction holding firms: A multi-objective optimization framework with risk analysis. Engineering, Construction and Architectural Management, 32(8), pp. 5534-5557. ISSN 0969-9988

Abstract

Purpose – This study aims to develop a framework for the optimal selection of construction project portfolios for a construction holding company. The objective is to minimize risks, align the portfolio with the organization's strategic objectives and maximize portfolio returns and net present value (NPV). Design/methodology/approach – The study develops a multi-objective genetic algorithm approach to optimize the portfolio selection process. The construction company's portfolio is categorized into four main classes: water projects, building projects, road projects and healthcare projects. A mathematical model is developed, and a genetic algorithm is implemented using MATLAB software. Data from a construction holding company in Iraq, including budget and candidate projects, are used as a case study. Findings – The case study results show that out of the 34 candidate projects, 13 have been recommended for execution. These selected projects span different portfolio classes, such as water, building, road and healthcare projects. The total budget required for executing the selected projects is $64.55m, within the organization's budget limit. The convergence diagram of the genetic algorithm indicates that the best solutions were achieved around generation 20 and further improved from generation 60 onwards. Practical implications – The study introduces a specialized framework for project portfolio management in the construction industry, focusing on risk management and strategic alignment. It uses a multi-objective genetic algorithm and risk analysis to minimize risks, increase returns and improve portfolio performance. The case study validates its practical applicability. Originality/value – This study contributes to project portfolio management by developing a framework specifically tailored for construction holding companies. Integrating a multi-objective genetic algorithm allows for a comprehensive optimization process, taking into account various objectives, including portfolio returns, NPV, risk reduction and strategic alignment. The case study application provides practical insights and validates the effectiveness of the proposed framework in a real-world setting.

Item Type: Article
Uncontrolled Keywords: genetic algorithm; multi-objective optimization; optimal selection; project management; project portfolio
Index terms: risk analysis, construction project, methodology, construction company, portfolio selection, mathematical model, risk reduction, genetic algorithm, project management, road project, construction industry, risk management, effectiveness, multi-objective optimization, net present value, case study, portfolio management
Subjects: financial risk, infrastructure engineering, production management, research methods, algorithms, environmental hazards, asset management, organization, economic analysis, project management theory and practice, performance management, industry analysis, mathematical modelling, risk assessment, data collection methods
Topics: Risk Management, Sustainability, Project Management, Engineering Principles, Quality Management, Business Strategy, Cost Management, Research Practice, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here