Application of the maturity model for collaborative scheduling for construction projects

Scala, N M; Alves, T d C L; Hawkins, D; Schiavone, V and Liu, M (2025) Application of the maturity model for collaborative scheduling for construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7399-7425. ISSN 0969-9988

Item Type: Article
Uncontrolled Keywords: alignment; collaboration; Delphi method; maturity model; moda; schedule
Index terms: Delphi method, maturity model, collaboration, construction project, scheduling
Subjects: production management, evaluation, data collection methods, operations research, management
Topics: Project Management, Research Practice, Time Control, Organizational Design
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here