Salleh, Rohaniyati (2009) Critical success factors of project management for Brunei construction projects: Improving project performance. PhD thesis, Queensland University of Technology, Australia.
Abstract
The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Kajewski, Stephen and Yang, Jun |
| Uncontrolled Keywords: | project management; construction projects; Brunei |
| Index terms: | private sector, owner, engineer, efficiency, Delphi method, variance, construction industry, project management, Brunei, statistical method, project performance, causes of delay, literature review, relative importance index, building construction, project party, survey, success factor, relative importance, critical success factor, project delay, construction project, methodology |
| Subjects: | industry analysis, statistical analysis, project controls, sociology, measurement and scaling, project management theory and practice, performance management, data analysis and analytics, health monitoring assessment and metrics, control systems, profession, risk assessment, data collection methods, building construction, Geography, production management, research methods |
| Topics: | Risk Management, Geographical Context, Project Management, Health and Safety, Quality Management, Construction Technology, Roles and Professions, Stakeholder Management, Research Practice, Business Strategy, Time Control |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here