Lam, T Y M and Gale, K S (2026) Construction framework process: A qualitative investigation of behaviour change drivers and project outcomes. Construction Innovation, 26(1), pp. 83-96. ISSN 1471-4175
Abstract
Purpose – Construction framework agreements are identified by the UK Government's Construction Strategy 2025 as an integrated procurement path to improve construction industry efficiency. However, criticisms from the industry have arisen from the lack of transparency and incorrect application of such frameworks. This paper aims to examine the client and supplier relationships within a framework agreement to discover what behaviour change drivers should be applied in the framework process to achieve the desired project outcomes. Design/methodology/approach – A triangulation approach was adopted. An initial literature review on organisational behaviour and job performance theories was conducted followed by a qualitative expert review survey of client construction managers to confirm the project outcomes desired by public-sector clients and the associated behaviour change drivers. This was followed by a qualitative multiple-case study investigation of eight typical framework projects to form a commonality of views to explain the impact of behaviour change drivers on project outcomes. Findings – Results from both qualitative studies demonstrated that improvements in project outcomes of time, cost, quality, sustainability and closer relationships can be driven by two sets of behaviour drivers: client organisational behaviour change drivers (setting up incentive and risk-sharing procurement approach, effective communication through development of stronger relationships and performance monitoring using contract key performance indicators) and supplier contextual behaviour change drivers (motivating conscientious behaviour and attitude towards self-improvement and innovations, supporting shared culture of providing services aligning with the client needs, promoting learning and development amongst all suppliers and most importantly providing trust and collaboration to the client). Research limitations/implications – The investigation was based on an expert review with eight multiple-case studies conducted within the geographical area of England. Further research should be conducted nationwide so that the findings can become more robust and benefit the entire public sector. Practical implications – It is suggested that framework managers should apply the supplier contextual performance drivers as selection criteria in the procurement process, whilst the client organisational performance drivers should be applied in the whole procurement and construction monitoring process to drive project outcomes aligned with the government construction policy objectives. Originality/value – This research demonstrates that the project behaviour of clients and suppliers can be shifted within the construction framework environment to yield the desired project outcomes. This can be achieved by applying the client organisational behaviour drivers and the supplier contextual behaviour change drivers in tandem to optimise the framework process.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | behaviour change drivers; construction framework process; expert review survey; multiple-case study; project outcomes; public sector |
| Index terms: | collaboration, methodology, construction manager, triangulation, behaviour change, manager, procurement process, literature review, performance monitoring, strategy, public-sector client, survey, monitoring, investigation, organizational performance, construction industry, selection criteria, transparency, England, framework agreement, efficiency, case study, key performance indicator, qualitative study, organizational behaviour, public sector, project outcome |
| Subjects: | data analysis and analytics, project delivery, profession, data collection methods, research design and methodology, business, control systems, sociology, industry analysis, administrative law, performance measurement, management, performance management, professional development, contractual arrangements, project completion, practitioner, behavioral psychology, tendering, research methods, monitoring and control systems, Geography |
| Topics: | Legal Issues, Quality Management, Procurement, Project Management, Geographical Context, Site Management, Organizational Design, Roles and Professions, Stakeholder Management, Governance, Business Strategy, Research Practice, Information Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here