Ameyaw, C; Mensah, S; Abaitey, B A and Asamoah-Duodu, A (2026) Adequacy of defects liability periods for public construction projects in Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 55-69. ISSN 2398-4708
Abstract
Purpose – The practice of the defects liability period (DLP) is a risk management strategy meant to secure durable and high-quality works. However, construction products continue to malfunction even after the expiration of DLPs. This study seeks to determine the adequacy of DLPs existing in the construction industry and propose appropriate DLPs for construction projects in the Ghanaian construction industry. Design/methodology/approach – Applying quantitative research strategy, 124 questionnaires were retrieved from construction professionals surveyed. The data obtained were analysed using descriptive statistics, Cramer's V and the significance test with the aid of Stata software. Findings – It was found that defects start showing in both buildings and roads within 12 months after being handed over for the client's use. The significance test and Cramer's V analysis indicate low concordance amongst respondents that the 6–12 month DLPs existing in Ghana are adequate. It is found that the existing DLP practice does not provide sufficient security to clients. Practical implications – Construction project clients will need to include the tenderer's proposed DLP as part of the tender evaluation criteria with the objective of picking up a signal of the quality of work to be delivered. Originality/value – This paper is one of the pioneering studies addressing the issue of the adequacy of DLPs in the construction industry in the Sub-Saharan Africa region. The findings trigger policy and regulatory changes in conditions guiding construction contracts procured in most developing countries that have adopted and adapted to the World Bank Public Procurement Guidelines.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction procurement; defects liability period; Ghana; investment theory; signal theory; warranty |
| Index terms: | construction product, tender evaluation, questionnaire, construction project, methodology, defects liability, strategy, Sub-Saharan Africa, developing country, statistics, construction industry, construction contract, risk management, construction procurement, public construction, construction professional, procurement guideline, warranty, Ghana, World Bank, quantitative research |
| Subjects: | building construction, research methods, tendering, physical geography and landforms, development economics, production management, contractual remedy, Geography, economic analysis, contractual arrangements, contract type, procurement strategy, industry analysis, management, performance measurement, professional development, institutional frameworks, data analysis and analytics, mathematical modelling, data collection methods, risk assessment |
| Topics: | Business Strategy, Information Management, Research Practice, Governance, International Construction, Contract Administration, Engineering Principles, Geographical Context, Project Management, Risk Management, Procurement, Quality Management |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here