Circular economy implementation in the construction industry: An examination of the barriers in a developing country

Bello, A O; Isa, R B; Oke, A E; Arogundade, S and Lewis, J M O (2026) Circular economy implementation in the construction industry: An examination of the barriers in a developing country. International Journal of Building Pathology and Adaptation, 44(1), pp. 143-162. ISSN 2398-4708

Abstract

Purpose – This study examines the barriers impeding the implementation of circular economy (CE) practices in the Nigerian architecture, engineering, construction and operation (AECO) industry across diverse regions of Nigeria. Design/methodology/approach – The study adopts a quantitative approach using a five-Likert scale questionnaire (Google Forms), utilizing various analytical tools, encompassing descriptive and inferential statistics. This methodological approach allows for a multifaceted exploration of the intricacies surrounding the barriers to circular CE. Findings – The study identifies and examines 24 CE barriers which are determined to be significant to the implementation of CE. These barriers were categorized into four categories: "Economic", "Market and Information", "Policy and Operational" and " product development". Research limitations/implications – The adopted sampling technique may restrict the generalizability of the findings within and beyond the selected regions. Furthermore, while the analytical methods offer a comprehensive analysis, they may not capture the nuanced intricacies that qualitative methodology could provide. However, the findings can be applied to other developing countries with characteristics similar to those of the Nigerian construction industry. Practical implications – The study's findings are significant for stakeholders such as policymakers, industry and academia. By elucidating CE-specific barriers, the research facilitates the formulation of targeted and tailored strategies, fostering the integration of CE principles in the Nigerian construction industry. Originality/value – This study presents novel insights into the barriers hindering the implementation of CE in the Nigerian construction industry. Offering tailored strategies and categorizing barriers into clusters adds a unique perspective to CE literature, particularly in developing countries.

Item Type: Article
Uncontrolled Keywords: circular construction; circular economy; construction projects; developing countries; project performance; sustainable construction
Index terms: statistics, construction industry, implementation, sampling, project performance, academia, Nigeria, circular economy, product development, questionnaire, Likert scale, construction project, exploration, methodology, integration, strategy, sustainable construction, developing country
Subjects: Geography, sustainable design, production management, sustainable construction, development economics, research methods, innovation studies, contractual arrangements, environmental resource management, project management theory and practice, management, industry analysis, organizational analysis, educational institutions, data collection methods, mathematical modelling
Topics: Education, Geographical Context, Project Management, Sustainability, Procurement, International Construction, Organizational Design, Business Strategy, Research Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here