Construction economics at early stage: Order of cost estimating, life cycle costing and development appraisal of a proposed office complex

Amadi, A I (2026) Construction economics at early stage: Order of cost estimating, life cycle costing and development appraisal of a proposed office complex. International Journal of Building Pathology and Adaptation, 44(1), pp. 70-90. ISSN 2398-4708

Abstract

Purpose – This study is carried out to demonstrate the computational practicalities of environmental construction economics necessary to offer early-stage cost advice. A case study of a private sector client's development proposal is used. This is for the acquisition of a vacant freehold land of 1.2 acres brownfield site to develop a Grade A office complex with plans to achieve the BREEAM Excellent rating green building certification. Design/methodology/approach – A three-stage methodology was deployed: Order of cost estimating, before life cycle costing and then development appraisal. The Order of Cost Estimate is generated using the BCIS online database, following the procedural guideline of the New Rules Measurement (NRM). The life cycle costing was carried out from an environmental perspective to explore two design options – Design A and Design B, in terms of which would offer the best value for money whilst reducing carbon emissions. Findings – Based on the outcome of the life cycle costing computations, Design B was chosen as the advised development due to minimal differences in net present values and annual equivalents. Further evaluation of Design B, using the residual method of developmental appraisal was carried out, with all necessary assumptions made. From the extensive computations carried out, the project is considered unviable, as it reports a loss. Alternative use of the site or an alternative site is thus recommended to check if a greater return on investment is tenable. Originality/value – The study narratively interweaves the application of three computational techniques that are core to offering early-stage cost advice.

Item Type: Article
Uncontrolled Keywords: construction economics; development appraisal; early cost advice; environmental impact; life cycle costing; order of cost estimating
Index terms: proposal, cost estimating, green building certification, BREEAM accreditation, methodology, construction economics, computation, environmental impact, appraisal, development appraisal, case study, carbon emission, life cycle, private sector, database, acquisition, net present value, best value, return on investment, cost estimate, land, costing, option
Subjects: environmental policy, bidding, project planning, economic analysis, environmental impact, climate science, financial analysis, factor and component analysis, research methods, accounting and finance, sustainable design, real estate economics, financial and cost management, data collection methods, business, computational methods, value management, data management, decision analysis, industry analysis
Topics: Risk Management, Procurement, Sustainability, Project Management, Business Strategy, Cost Management, Research Practice, Urban Studies, Digital Applications
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here