Jayasinghe, H M; Sandanayake, Y G and Jayasinghe, R (2026) Managing conflicts in joint venture contracts in infrastructure construction projects in Sri Lanka. Built Environment Project and Asset Management, 16(2), pp. 415-436. ISSN 2044-124X
Abstract
Purpose – Understanding and addressing the causes and root causes of inevitable conflicts is essential for conflict management in Construction Joint Ventures (CJVs). However, there is a lack of research identifying these causes, root causes and conflict management approaches in different stages of a CJV's lifecycle. Therefore, this paper presents a framework to manage conflicts during the inception, formation and operational stages of CJVs in infrastructure projects in Sri Lanka. Design/methodology/approach – A qualitative multiple case study approach was employed to investigate four CJV infrastructure projects in Sri Lanka, selected through purposive sampling. During the case studies, data were gathered through multiple sources, including eight in-depth interviews with senior project managers and document reviews. The collected data were analysed using content analysis and the root cause analysis tool, Five-Whys analysis. Findings – Findings are mapped into a framework suggesting a structured approach to conflict management, emphasising the importance of proactive and reactive approaches for addressing causes and root causes across CJV's lifecycle. Conflicts at the inception stage are minimal due to limited interaction between partners; however, selecting a suitable CJV partner is crucial. During the formation and operational stages, disagreements are often managed through negotiation as a reactive approach, while the root causes of these disagreements can be addressed through suitable proactive approaches, such as entering into an all-inclusive CJV contract agreement. Originality/value – This study proposes a conflict management framework for infrastructure CJVs uncovering the underlying root causes of conflicts, along with relevant proactive and reactive conflict management approaches at different stages of the lifecycle in CJV projects in Sri Lanka.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | approaches; conflict management; construction joint ventures; root-cause analysis; Sri Lanka |
| Index terms: | content analysis, conflict management, interview, root cause analysis, infrastructure construction, methodology, joint venture, case study, project manager, negotiation, purposive sampling, interaction, infrastructure project, Sri Lanka, lifecycle |
| Subjects: | project delivery, data analysis and analytics, business, profession, risk assessment, data collection methods, conflict resolution, infrastructure and transport systems, civil engineering, behavioral psychology, research methods, Geography |
| Topics: | Risk Management, Project Management, Geographical Context, Engineering Principles, Stakeholder Management, Roles and Professions, Business Strategy, Research Practice |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here