Collusion prevention under different forms of performance-based subsidies during the operational period in PPP highway projects

Hou, Y and Wang, H (2026) Collusion prevention under different forms of performance-based subsidies during the operational period in PPP highway projects. Construction Management and Economics, 44(2), pp. 98-118. ISSN 0144-6193

Abstract

The high-quality services of public–private partnership (PPP) highway projects have been receiving increasing attention from the government and private sector. Performance-based subsidies and regulations incentivize the private sector to improve service quality. However, third-party regulators may collude with the private sector to report false performance information for subsidies. This study investigates the conditions for incentivizing service quality and preventing collusion in long-term, multistage games by constructing tripartite evolutionary game models. It compares different forms of performance-based subsidies to optimize incentive effects. The results present thresholds for performance-based subsidies that effectively incentivize the private sector in the long run under collusion risk. Factors such as the additional cost of improving service quality and collusive share influence these thresholds. Based on numerical analyses of highway cases, results indicate the short-term incentive effect of collusion penalties for regulators and the private sector. Through demand-based subsidies, the government can incentivize the private sector to improve their services at lower costs. This study contributes to the relevant literature by focusing on opportunistic performance regulations and multiple subsidy forms. It also helps address collusion in a long-term, multistage process and provides insights for optimizing government subsidy decisions to enhance PPP performance and promote social welfare.

Item Type: Article
Uncontrolled Keywords: collusion prevention; evolutionary game theory; performance-based subsidy; PPP highway project
Index terms: regulator, partnership, private sector, subsidy, evolutionary game, prevention, highway construction, collusion, numerical analysis, penalty, performance-based, regulation, service quality, operational period
Subjects: data analysis and analytics, project delivery, partnership management, sociology, regulatory law, industry analysis, political science, economic theory, performance measurement, civil engineering, economic analysis, tendering, financial risk
Topics: Cost Management, Business Strategy, Research Practice, Stakeholder Management, Governance, Project Management, Engineering Principles, Procurement, Legal Issues, Quality Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here