Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation

Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.

Abstract

Project duration overruns remain a persistent challenge in the construction industry, leading to increased costs, compromised quality, environmental impacts, and reduced stakeholder confidence. In the UK alone, housing projects experienced average time overruns of 43% (2007–2019), and infrastructure projects saw a 65% increase in delivery timelines (2012–2021). Despite the evolution of scheduling tools such as CPM and PERT, embedded in platforms like Microsoft Project, Asta Powerproject and Primavera P6, their reliance on subjective input and limited data integration hinders their effectiveness, particularly at early project stages. Moreover, recent AI-enabled platforms like Procore, Autodesk Construction Cloud (ACC) remains focused on delivery stage planning and control of projects. This study, therefore aims to develop an automated time-estimating model that helps clients make informed decisions about project duration estimates especially at the early stages of the project life cycle. This study critically reviews existing scheduling practices and proposes a data-driven alternative: the Intelligent Project Duration Estimating System (IPDES). Developed using a hybrid methodology combining Design Science Research, System Design, and traditional scientific paradigms, IPDES integrates 500 historical UK residential project datasets with categorised delay risks - client, contractor, consultant, and external related risks. The system uses Artificial Neural Networks (ANNs) in Neural designer to model non-linear relationships and prioritise stable input variables (e.g., internal floor area, number of units) over traditionally used but less stable predictors such as cost. The model underwent extensive training, input optimisation, and validation. The optimum ANN model achieved a normalised squared error (NSE) of 0.007, a coefficient of determination (R²) of 0.993, and an average prediction error of 0.51%, significantly outperforming baseline models. Error distribution analysis revealed that over 30% of predictions clustered around zero error, and predicted durations more closely matched actual completions than initial planned estimates, highlighting the model’s superior forecasting and generalisability reliability. Beyond addressing structural inefficiencies and fragmented planning practices, the research presents IPDES as a scalable, intelligent solution for early-stage project duration forecasting. The study’s findings challenge cost-centric estimation methods and reinforce the value of AI in enhancing predictive precision and operational efficiency in construction project management. The research concludes with forwardlooking recommendations, including: establishing a centralised industry repository for historical and risk data; developing integrated, project-based risk management systems; and promoting user-friendly, cost-effective AI platforms accessible to nontechnical users. Future research should explore sub-duration predictions (e.g., piling, substructure) and plug-in integration with scheduling tools like Asta Powerproject and Oracle Primavera. These initiatives aim to foster widespread adoption of intelligent systems, driving more efficient, risk-aware, and data-centric construction project delivery.

Item Type: Thesis (Doctoral)
Thesis advisor: Udeaja, Chika; Fong, Daniel and Chen, Yuting
Index terms: methodology, residential project, integration, evolution, environmental impact, validation, dataset, estimating, scheduling, design science research, housing project, overrun, construction project delivery, artificial neural network, paradigm, effectiveness, construction project management, risk management, duration, construction industry, estimate, infrastructure project, construction time, efficiency, platform, time overrun, forecasting, life cycle, designer, estimation, intelligent system
Subjects: environmental impact, operations research, environmental science, research methods, economic development, digital design, automation and robotics, housing and residential development, profession, risk assessment, value management, modelling and simulation, financial and cost management, prediction and forecasting, performance management, design practice, education and knowledge transfer, professional development, project management theory and practice, organizational analysis, data management, project controls, infrastructure and transport systems, industry analysis
Topics: Roles and Professions, Cost Management, Research Practice, Information Management, Time Control, Organizational Design, Design Practice, Urban Studies, Digital Applications, Risk Management, Sustainability, Project Management, Engineering Principles, Quality Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here