Project performance diagnostics: A model for assessing construction project performance in Nigeria

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Abstract

Construction Projects are notorious for demonstrating poor performance and under achievement as usually indicated by project objectives. Project managers in the construction industry are faced with many research suggestions in literatures to improve performance but there are confusion in the implementation of these recommendations. These could be attributed to dearth of literatures that comprehensively treat critical success factors; CSFs as drivers of key performance indicators; KPIs for assessing construction project performance. KPIs are measure of indication of the workings of CSFs for project performance thus, both are present on projects and useful in exploring the underlying dynamic structure of complexity inherent in construction projects. The study determine CSFs for KPIs of cost, time, quality and health/safety which were used to develop a dynamic Project Performance Diagnostic Model which gives feedback for improved decision making in the context of diagnosing project performance in the Nigeria construction industry. This research tends not to discard the positivism or interpretivism philosophical stance by being pragmatic. Pragmatism argues that the most important determinant of epistemology, ontology and axiology adopted on research is determined by appropriately answering particular research question thus, this research adopted the pragmatism philosophy. The research process involves different phases with quantitative-qualitative research technique corresponding to the two respective ends of the positivist-constructivist paradigm continuum. The data for this research were collected through interviews of focus expert group and survey questionnaire in a form of data generation triangulation. Results of the qualitative aspect were used to develop a questionnaire, which was analysed using statistical techniques including factor analyses. The CSFs of KPIs so analysed were used to develop PPDM system dynamic based model to simulate the interplay and effects of different CSF components for aiding decision making of project managers. The research suggests that Cost as a key performance indicator has the most overriding impact on construction project performance with three components. The three dimensions to Cost performance indicator are Contractor's Management Capacity, Client's Commitment to Progress of Project, and Economic Environment of Project Estimate. Time performance indicator would impact performance in four different dimensions identified as Design Team Commitment to Project Management Outcomes, Capacity of Contractor for Project Management, Construction Resource Management, and External Factors. Quality performance indicator discovered three-component dimensions labelled Project Communication Management with Design and Workforce, Contractor Capacity for Resource Management on Quality Objective, and Project Manager's Competence on Information Coordination and Construction Method. There are two dimensions that impact Health and Safety performance indicator which are Effective Finance of Site Management for Health Safety Implementation and Capacity of Contractor for Project Management and Safety Programme. These different components of KPIs were used for the development of a dynamic Project Performance Diagnostic Model. The study emphasized the importance of contractor to cost performance and the design team commitment to time performance with the underlying relationship of the CSFs in predicting the KPIs.

Item Type: Thesis (Doctoral)
Index terms: determinant, implementation, estimate, construction industry, dimension, epistemology, resource management, project management, coordination, paradigm, quality performance, site management, project performance, factor analysis, Nigeria, contractor capacity, project manager, key performance indicator, critical success factor, cost performance, pragmatism, complexity, triangulation, qualitative research, decision-making, time performance, construction project, competence, positivism, questionnaire, commitment, design team, survey, construction method, philosophy, programme, ontology, performance indicator, interview, health and safety, project communication, interpretivism
Subjects: Geography, health safety and environment, production management, theoretical framing, building construction, contractual arrangements, construction operations, professional practice, psychology, personnel development, project management theory and practice, professional development, education and knowledge transfer, management, economics, performance management, industry analysis, philosophical studies, statistical analysis, systems engineering, philosophical concept, project controls, decision analysis, control systems, profession, risk assessment, data collection methods, research design and methodology, health monitoring assessment and metrics, project delivery, financial and cost management, knowledge theory
Topics: Quality Management, Risk Management, Procurement, Health and Safety, Geographical Context, Project Management, Engineering Principles, Organizational Design, Site Management, Time Control, Design Practice, Human Resources, Roles and Professions, Cost Management, Research Practice, Information Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here