Private financing of infrastructure projects in sub Sahara Africa: A case study of Nigerian water infrastructure project

Maiwada, Yusuf Bashir (2003) Private financing of infrastructure projects in sub Sahara Africa: A case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.

Abstract

Water infrastructure projects are vital for life, as they provide the basic needs for human survival (food and clean water), and are crucial for socio-economic development and improvement of the general standard of living in any country. In most Sub-Saharan African countries, there exists a complex problem of poorly managed and inefficient water services, inadequate in terms of both quantity and quality. The problem is compounded by exponential population growth, especially in the urban areas, and lack of sufficient funding of water-related infrastructure. These problems, when combined with the prevailing poverty, are stifling economic growth and reducing an already low standard of living in most countries in the region. There is an urgent need and great demand for water infrastructure development projects to meet the requirements of the rising population throughout the region. This demand can only be fulfilled by well-conceived and managed water utility projects with the active participation of both public and private sectors. Public financing of water infrastructure projects in SSA has not only failed to meet the rising demand for water services but has also contributed to the existing debt burden in most countries in the region. There is a need for active 'private sector participation in financing and managing water infrastructure projects in SSA; however, this is only possible for projects with potential for revenue generation. A mechanism is proposed combining Integrated Water Catchment Management (IWCM) with private sector involvement in the financing, construction, operation and management of water infrastructure projects. Combining these strategies will form the basis of a Public-Private Partnership (PPP). The promotion of combining strategies is supported by a case study on the River Niger Catchment Area (RNCA) using a BOOT contract. A survey was conducted to evaluate consumers' willingness to pay and acceptance of privatised water supply services. The fact that an informal but extensive network of private water vendors already exists in virtually all Nigerian cities is also acknowledged. A further case study is based on management contract for some of the existing water utilities in RNCA.

Item Type: Thesis (Doctoral)
Index terms: private sector, partnership, poverty, promotion, case study, Africa, survival, economic growth, infrastructure project, funding, infrastructure development, revenue, survey, strategy, water utility, private sector participation, water supply, economic development, willingness to pay, financing, population, urban area
Subjects: urban form and morphology, economic development, infrastructure engineering, demography, economic analysis, environmental science, management, sociology, partnership management, price determination, industry analysis, infrastructure and transport systems, data collection methods, stakeholder participation, regions and continents
Topics: Human Resources, Urban Studies, Research Practice, Business Strategy, Stakeholder Management, Ethics, Geographical Context, Engineering Principles, Procurement, Sustainability
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here