Mitchell Jr., Zane Windsor (1998) A statistical analysis of construction equipment repair costs using field data & the cumulative cost model. PhD thesis, Virginia Tech, USA.
Abstract
The management of heavy construction equipment is a difficult task. Equipment managers are often called upon to make complex economic decisions involving the machines in their charge. These decisions include those concerning acquisitions, maintenance, repairs, rebuilds, replacements, and retirements. The equipment manager must also be able to forecast internal rental rates for their machinery. Repair and maintenance expenditures can have significant impacts on these economic decisions and forecasts. The purpose of this research was to identify a regression model that can adequately represent repair costs in terms of machine age in cumulative hours of use. The study was conducted using field data on 270 heavy construction machines from four different companies. Nineteen different linear and transformed non-linear models were evaluated. A second-order polynomial expression was selected as the best. It was demonstrated how this expression could be incorporated in the Cumulative Cost Model developed by Vorster where it can be used to identify optimum economic decisions. It was also demonstrated how equipment managers could form their own regression equations using standard spreadsheet and database software.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Vorster, Michael C; Schulman, Robert S; Martinez, Julio C; Beliveau, Yvan J; de la Garza, Jesus M and Karfakis, Mario G |
| Uncontrolled Keywords: | construction equipment; earthmoving equipment; equipment economics |
| Index terms: | cost model, replacement, repair, manager, heavy construction, earthmoving, construction equipment, spreadsheet, regression model, statistical analysis, acquisition, database |
| Subjects: | maintenance engineering, construction operations, practitioner, materials science, data management, statistical analysis, infrastructure and transport systems, construction equipment, financial and cost management, data science, business |
| Topics: | Engineering Principles, Digital Applications, Site Management, Cost Management, Business Strategy, Research Practice, Roles and Professions, Plant and Equipment |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here