Assessing the mediating role of project management training on the nexus between job satisfaction and project performance in the Nigerian construction industry

Sajuyigbe, Ademola Samuel; Ogundare, Olusegun Samuel; Sanusi, Bolanle Mistura; Akinbobola, Abiola Olubunmi; Tella, Adeniran Rahman and Obi, Nwoye James (2026) Assessing the mediating role of project management training on the nexus between job satisfaction and project performance in the Nigerian construction industry. Journal of Construction Business and Management, 8(2), pp. 1-14. ISSN 2521-0165

Abstract

This study fills a critical gap in behavioral science by exploring the mediating role of project management training (PMT) in the relationship between job satisfaction (JS) and project management performance (PMP) within Nigeria's construction industry a context rarely examined in prior research. Using a non-probabilistic sample of 250 professionals, with 208 valid responses, data were analyzed through structural equation modeling to test both direct and indirect effects. Results show that JS has a significant positive effect on PMP (β = 0.250; p = 0.003), while PMT strongly predicts PMP (β = 0.833; p = 0.000). Indirect effects analysis confirms that PMT partially mediates the JS–PMP relationship (β = 0.295; p = 0.000), meaning job satisfaction still enhances performance even when training is accounted for. This mediating role represents the study’s key novelty, demonstrating that training amplifies but does not replace the influence of employee satisfaction on project outcomes. The findings emphasize that improving job satisfaction alone is insufficient for optimal project results. Targeted PMT equips workers to manage complex construction demands, boosting engagement and overall performance. Practically, the study provides actionable insights for managers and policymakers: integrating structured training programs with initiatives to enhance job satisfaction is essential for stronger project delivery and sustainable development within Nigeria’s construction sector.

Item Type: Article
Uncontrolled Keywords: project management training, job satisfaction, project management performance
Index terms: construction demand, project performance, construction industry, project management, project delivery, satisfaction, Nigeria, project outcome, job satisfaction, program, indirect effect, construction sector, manager, structural equation modelling, sustainable development, science, meaning
Subjects: sociology, statistical analysis, industry analysis, software systems, management, project management theory and practice, project delivery, market analysis, health safety and environment, Geography, analytical methods, project completion, practitioner, specialized education
Topics: Research Practice, Roles and Professions, Digital Applications, Human Resources, Health and Safety, Geographical Context, Project Management, Procurement, Education
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here