Chigara, B. and Smallwood, J. (2026) The impact of procurement on construction health and safety (H&S) in Zimbabwe. Journal of Engineering, Design and Technology, 24(4), pp. 943-962. ISSN 1726-0531
Abstract
Purpose – The construction sector's poor health and safety (H&S) performance is increasingly attributed to inappropriate procurement systems. However, limited research has investigated the key aspects of procurement management that undermine construction H&S hence, the purpose of this study is to identify these aspects that significantly affect construction H&S in Zimbabwe. Design/methodology/approach – A quantitative research approach was used, involving the completion of a structured questionnaire by 90 construction professionals in Zimbabwe. The collected data were analysed using descriptive and inferential statistics. Findings – The study identified seven aspects of procurement management that are perceived to have a significant effect on construction H&S. The top five aspects of procurement management affecting H&S are inadequate inclusion of H&S-specific clauses in contract documents, client-delays to consider H&S until after bidding and specifically during the project execution phase, appointment of designers who neglect worker H&S in their designs, the appointment of contractors who have not fully considered H&S aspects of a project, and inadequate facilitation of financial provision for H&S. Factor analysis revealed two significant factors, namely, procurement method and selection criteria, and contract management of H&S issues. Practical implications – The findings highlight the significant impact procurement entities can have on improving construction H&S. Construction industry stakeholders may find the results beneficial, as they identify specific areas to focus on to improve H&S performance through effective procurement strategies. Originality/value – The identification of specific procurement functions that require targeted interventions to improve project H&S outcomes significantly contributes to the body of knowledge related to enhancing H&S performance through procurement.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | health and safety; procurement; Zimbabwe |
| Index terms: | factor analysis, procurement system, construction professional, construction industry, selection criteria, statistics, quantitative research, procurement method, designer, procurement strategy, procurement management, questionnaire, contract document, methodology, Zimbabwe, bidding, body of knowledge, construction sector, contract management, health and safety |
| Subjects: | data analysis and analytics, mathematical modelling, data collection methods, profession, statistical analysis, industry analysis, procurement strategy, professional development, contractual condition, bidding, knowledge management, contractual arrangements, research methods, tendering, contract management, health safety and environment, Geography |
| Topics: | Health and Safety, Geographical Context, Procurement, Information Management, Research Practice, Roles and Professions, Contract Administration |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here