Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708
Abstract
Purpose – This research aims to identify, rank and evaluate the impact of delay factors on the timely completion of the handover stage of construction projects in the United Arab Emirates (UAE). Design/methodology/approach – The study was conducted in two stages. Initially, an extensive literature review and focus groups with industry professionals were utilized to identify and rank delay factors specific to the UAE's construction sector. Second, data were collected from multiple construction firms in the UAE, and a delay estimation model was developed and subsequently validated. Findings – A total of 30 delay factors were identified and ranked according to their significance index values. The top five factors were linked to various stakeholders, including subcontractors, general contractors, customers and project owners. The developed model demonstrated an accuracy of 71% on the test dataset. Research limitations/implications – While the model shows promising results, its accuracy could be further enhanced with additional data or through the exploration of more advanced nonlinear predictive models. Practical implications – The findings can assist various construction project stakeholders to better manage and mitigate delays, potentially leading to more successful project completions. Social implications – Improving the efficiency of the handover process can lead to faster project completions, which in turn can reduce the social inconvenience caused by prolonged construction activities. Originality/value – The study is novel in focusing specifically on the UAE and Gulf region, where previous research is limited. The development and validation of a delay estimation model tailored to this regional context enhances the originality of the research.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction delays; delay estimation model; delay factors; handover stage; project management; UAE |
| Index terms: | focus group, general contractor, literature review, construction firm, accuracy, methodology, exploration, construction delay, construction project, validation, United Arab Emirates, construction sector, dataset, subcontractor, efficiency, case study, construction activity, owner, estimation, modelling, project management |
| Subjects: | analytical methods, construction operations, environmental resource management, practitioner, organization, production management, Geography, research methods, financial and cost management, data analysis and analytics, data collection methods, industry analysis, sociology, data management, project controls, professional development, project management theory and practice, performance management |
| Topics: | Sustainability, Engineering Principles, Geographical Context, Project Management, Quality Management, Stakeholder Management, Roles and Professions, Cost Management, Business Strategy, Information Management, Research Practice, Time Control, Site Management, Digital Applications |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here