A framework of total constraint management for improving work flow in liquefied natural gas construction

Wang, J; Shou, W and Wang, X (2015) A framework of total constraint management for improving work flow in liquefied natural gas construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Abstract

In complex and concurrent construction project, numerous constraints which come from engineering, supply chains and construction work face are the main factors affecting plan reliability. Effective management of these constraints is critical to improve planning reliability and work flow. However, current constraint management approach is very fragmented and heavy relies on human's commitments and static data in constraint identification, tracking, assessment and removal. To tackle this problem, this paper proposes a framework of Total Constraint Management (TCM), which possesses four superior characteristics including: (1) collaborative constraint identification; (2) real-time constraint status tracking; (3) dynamic constraint removal; and (4) visual constraint representation. Advanced technologies, such as Building Information Modelling, barcode, and Radio Frequency Identification, are discussed to enable TCM implementation in practice. A controlled experiment was developed to demonstrate and evaluate the framework. The results showed that successful implementation of TCM could significantly improve plan reliability and construction productivity.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: planning reliability; total constraint management; work flow
Index terms: construction productivity, concurrent construction, radio frequency identification, implementation, total constraint management, experiment, building information modelling, construction work, face, commitment
Subjects: management, information systems, digital technology, contractual arrangements, psychology, operations management, data collection methods
Topics: Site Management, Research Practice, Organizational Design, Project Management, Digital Applications, Procurement, Business Strategy
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here