Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Abstract
Literature analysing cost overruns in highway projects abound the literature: most espouse that Infrastructure clients face significantly higher levels of cost overrun than those experienced by other construction industry sectors. The consequences of cost overruns in highway projects has led some to question the efficiency of public highway commissioners through the developed and developing world, leading to questions about the ability of such organisations to initiate and deliver highway infrastructure projects. An expansive range of research identifying theoretical and technical explanations for this negative trend has emerged from academe, resulting in the emergence of three distinct schools of thought. The first suggests reliant on heuristics and optimism bias is responsible for poor accuracy levels. The second espouses that inaccuracy stems from deliberate deception by clients and their professional advisors due to corruption or politically induced malpractice. Whereas the final school suggest technical explanations, most likely resulting from 'Latent Pathogens', which often lay dormant in the complex interactive processes of infrastructure projects are unintentionally triggered and lead to a series of events culminating in a cost overrun. In an attempt to better understand the impact of latent pathogens on the accuracy of project estimates in the Niger Delta, longitudinal cost data gathered from 61 completed highway infrastructure projects has been comprehensively analysed,. The results identify that latent pathogens such as heterogeneous ground conditions, account for the majority of the recorded variance between the initial estimates and the project’s final account.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | cost overrun; geotechnical; heterogeneous; ground conditions; Niger delta |
| Index terms: | emergence, final account, infrastructure project, optimism bias, estimate, highway infrastructure, construction industry, cost data, corruption, Niger Delta, pathogen, ground condition, highway construction, Nigeria, accuracy, cost overrun, face, heuristic, commissioner, efficiency, variance |
| Subjects: | risk assessment, practitioner, psychology, financial and cost management, civil engineering, performance management, accounting and finance, physical geography and landforms, health risk and incident analysis, professional development, Geography, cognitive psychology, geotechnical engineering, measurement and scaling, payment, systems engineering, professional ethics, infrastructure and transport systems, industry analysis |
| Topics: | Geographical Context, Research Practice, Information Management, Engineering Principles, Cost Management, Health and Safety, Roles and Professions, Risk Management, Quality Management, Legal Issues, Organizational Design, Contract Administration |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here