Okanlawon, T. T.; Oyewobi, L. O.; Kabir, I.; Badamasi, A.; Dodo, M. and Jimoh, R. A. (2026) Enhancing the integration of digital twin in construction phases: Key drivers for adoption in Nigeria. Journal of Engineering, Design and Technology, 24(1), pp. 124-150. ISSN 1726-0531
Abstract
Purpose – This paper aims to investigate the key drivers of digital twin (DT) implementation in the construction industry (CI). Design/methodology/approach – Quantitative approach was used, and questionnaires was distributed to professionals in the construction sector. Snowball sampling technique was used to collect responses from 120 professionals. The study developed a framework and tested the hypotheses using partial least square structural equation modelling (PLS-SEM). Findings – The result of PLS-SEM showed an R2 value of 69.2%, 86.9% and 77.1% for the design phase, construction phase and operation phase, respectively. The findings of this study showed that concept-oriented drivers, operational success drivers, production-driven drivers and preservation-driven drivers are the most important drivers of implementing DT in the construction phase. Practical implications – While the framework builds upon and adapts existing theoretical models, its contribution lies in offering a phase-specific empirical analysis of DT adoption drivers within the underexplored Nigerian context, thereby extending their applicability to emerging economies. This provides actionable insights for practitioners and policymakers seeking to enhance DT integration strategies. Originality/value – The study developed a conceptual framework and examined it using PLS-SEM. Hence, the findings and insights of the study provide a solid foundation for practitioners to use DT as a tool to improve various aspects of the construction process.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction phases; digital twin; drivers; industry 4.0; Nigeria |
| Index terms: | sampling, methodology, operation phase, digital twin, strategy, structural equation modelling, construction phase, industry 4.0, construction process, Nigeria, emerging economy, implementation, conceptual framework, practitioner, construction sector, questionnaire, design phase, partial least square, integration, construction industry |
| Subjects: | research methods, management, industry analysis, organizational analysis, contractual arrangements, technology adoption, Geography, professional practice, building construction, practitioner, digital engineering, data collection methods, project delivery, economic development, statistical analysis, theoretical framing |
| Topics: | Design Practice, Organizational Design, Business Strategy, Procurement, Project Management, Digital Applications, Research Practice, Site Management, Roles and Professions, International Construction, Geographical Context |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here