A state-of-the-art review of the application of interpretive structural modelling in construction management studies

Wuni, I. Y. and Eshun, B. T. B. (2026) A state-of-the-art review of the application of interpretive structural modelling in construction management studies. International Journal of Construction Management, 26(10), pp. 2116-2136. ISSN 1562-3599

Abstract

The tight couplings among construction stages, activities, resources, stakeholders, and outcomes render construction management problems amenable to complexity modelling. The interpretive structural modelling (ISM) and total ISM (T/ISM) technique combines graph theory, systems-thinking philosophy, and graphical procedures to develop hierarchical structural models of the complex relationships between components of construction management problems. As such, the T/ISM technique has gained popularity in the construction management literature. However, studies assessing the quality of the T/ISM models developed in the construction management literature are scarce. Therefore, this study conducted a systematic review of 134 studies to investigate how the tenets and principles of T/ISM have been operationalized in the construction management literature. It is discovered that most of the studies failed to adhere to the tenets of the T/ISM techniques, resulting in models lacking validity. The results further revealed a lack of consensus regarding the optimum number of constructs that should be modelled, who constitutes an expert and optimum sample size, the most appropriate data collection instruments, and how to verify correctness and validity of T/ISM models in construction management research. The study offered resolutions to the identified shortcomings of the literature and thus provides additional clarity on implementing the T/ISM approach in construction management research.

Item Type: Article
Uncontrolled Keywords: construction industry; construction management; hierarchical structural model; ISM; TISM; total interpretive structural modelling
Index terms: validity, coupling, modelling, management research, philosophy, state of the art, sample size, resolution, construction stages, complexity, construction industry, interpretive structural modelling, systematic literature review, graph theory
Subjects: industry analysis, research dissemination and communication, research evaluation and metrics, theoretical framing, systems engineering, evaluation and assessment methods, data analysis and analytics, research design and methodology, project delivery, philosophical studies, analytical methods, conflict resolution
Topics: Engineering Principles, Stakeholder Management, Research Practice, Project Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here