EFA models for evaluating stakeholder perceptions of falls-from-height risks in building projects: A case study from Vietnam

Khanh, H. D.; Tiep, N. V. and Nguyen, K. V. (2026) EFA models for evaluating stakeholder perceptions of falls-from-height risks in building projects: A case study from Vietnam. Journal of Engineering, Design and Technology, 24(6), pp. 1483-1509. ISSN 1726-0531

Abstract

Purpose – Falls-from-height (FFHs) are widely recognized as one of the principal causes of life-threatening accidents in the construction industry. However, stakeholders significantly differ in how they prioritize the underlying causes of FFHs. Therefore, this study aims to develop models to evaluate their perceptions of FFH risks. Design/methodology/approach – Drawing on a comprehensive literature review and expert consultation, this study identified 28 factors related to FFH that are relevant to the Vietnamese construction context. A structured questionnaire was administered to project stakeholders to evaluate these factors. In total, 150 valid data sets were collected and then analyzed using principal analysis tools, including mean scores, Spearman's rank correlation and exploratory factor analysis. Findings – The findings indicate that, although stakeholders exhibit a high consensus in ranking the FFH risks, their assessments differ significantly. Contractors assigned the lowest average rating (3.46), compared with consultants (3.65) and owners (3.49), highlighting a concerning gap in FFH risk perception. Across all factors, the critical risks are: "unstable scaffolding and ladders" and "slippery surfaces". Given these perceptual differences, the study developed separate factor models, which contain four to six principal components that explain the total variance with a minimum of 70% for each stakeholder group. Originality/value – The findings support stakeholders in strengthening their awareness of FFH hazards and formulating more practical and targeted strategies for FFH prevention and control.

Item Type: Article
Uncontrolled Keywords: building performance; building projects; factor analysis; falls-from-heights; health and safety; models; safety I; stakeholder perceptions
Index terms: building performance, methodology, falls, prevention, owner, Vietnam, case study, risk perception, strategy, questionnaire, factor analysis, exploratory factor analysis, health and safety, project stakeholder, drawing, strengthening, literature review, scaffolding, construction industry, variance
Subjects: management, research methods, industry analysis, measurement and scaling, health safety and environment, statistical analysis, financial risk, technical documentation, structural engineering, environmental hazards, data analysis and analytics, sociology, Geography, operations management, health risk and incident analysis, quality assurance, data collection methods
Topics: Design Practice, Sustainability, Site Management, Research Practice, Quality Management, Engineering Principles, Health and Safety, Stakeholder Management, Business Strategy, Cost Management, Geographical Context
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here