Modeling causes and strategies in BIM execution plan development: A PLS-SEM approach

Mahazir, M.; Zainudin, N. M. and Rahman, R. A. (2026) Modeling causes and strategies in BIM execution plan development: A PLS-SEM approach. Construction Innovation, pp. 1-31. ISSN 1471-4175

Abstract

Purpose – This study aims to examine how the causes of ineffective building information modeling (BIM) execution plans (BEPs) influence the strategies required to improve BEP development. Design/methodology/approach – A systematic literature review of 57 articles and semistructured interviews with 20 BIM professionals identified 30 causes of ineffective BEPs and 32 improvement strategies. A total of 122 BIM professionals evaluated the criticality of the causes and strategies through a questionnaire survey. The collected data were analyzed using exploratory factor analysis (EFA) and partial least squares structural equation modeling (PLS-SEM). Findings – EFA grouped the causes into two constructs, namely, BEP deficiencies and BEP development issues, and the strategies into four constructs: adaptability and continuous update, BEP management requirement, comprehensive and integrated BEP and BEP technical aspects and deliverables. The PLS-SEM results show that BEP development issues significantly influence all four strategy constructs, whereas BEP deficiencies significantly influence only adaptability and continuous update. These findings indicate that development-stage problems require broader strategic responses than deficiencies identified in completed BEPs. Originality/value – This study extends existing BEP research by modeling the relationship between the causes of ineffective BEPs and strategies required to improve BEP development. The findings provide a basis for strengthening BEP development in BIM-based construction projects.

Item Type: Article
Uncontrolled Keywords: BIM; digitalization; management; project management
Index terms: partial least square, interview, structural equation modelling, modelling, exploratory factor analysis, construction project, project management, strengthening, execution plan, adaptability, strategy, questionnaire, survey, building information modelling, methodology, systematic literature review, digitalization
Subjects: statistical analysis, production management, structural engineering, information systems, project controls, management, research methods, project management theory and practice, data collection methods, research evaluation and metrics, analytical methods, digital technology, user focus
Topics: Project Management, Time Control, Research Practice, Engineering Principles, Design Practice, Digital Applications, Business Strategy
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here