An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029

Abstract

Construction cost is a major concern to both clients and contractors. Based on a hypothetical construction project (a six-storey concrete framed office building), cost and other related information was collected through a survey of contractors in Japan, the UK and the US. Using multiple regression analysis it was found that lower overheads, less prefabricated components, and fewer design variations could reduce construction cost. Overheads largely represent indirect costs to contractors and if reduced can lead to increased profit levels and improved competitiveness. The use of prefabricated components may be problematic where there are delays in production, insufficient coordination between design and construction, and congested transportation on site. Design variations during construction bring about uncertainties and are disruptive to the construction process. These factors have paramount impact on construction cost and demand close attention and consideration. Contractors are advised to reduce the costs of their overheads and utilise prefabrication appropriately, while clients and designers should minimise the number of design variations during construction if better cost performance is desired.

Item Type: Article
Uncontrolled Keywords: cost; contractors; questionaire survey; Japan; UK; USA
Index terms: construction project, construction process, variation, investigation, indirect cost, competitiveness, design and construction, multiple regression analysis, construction cost, prefabrication, office building, Japan, prefabricated component, coordination, overheads, profit, survey, cost performance, designer
Subjects: management, data collection methods, profession, construction type, economics, production management, contractual condition, Geography, design methods, market analysis, building construction, contractual arrangements, financial and cost management, cost management, statistical analysis, economic analysis, financial analysis
Topics: Contract Administration, Site Management, Organizational Design, Design Practice, Roles and Professions, Procurement, Construction Technology, Cost Management, Business Strategy, Research Practice, Geographical Context, Project Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here