Brooks, T; Bruen, J and Curran, M (2020) The value of 'non-value adding' activity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Abstract
Lean Construction seeks to make construction more efficient through the elimination of so called 'non-value adding' activity. Some proponents of lean construction advocate tracking of workers' movement to identify and eliminate all 'wasteful' activity and increase site efficiency. With the advent of industry 4.0 the potential for worker observation and tracking will increase. The act of labelling activity and time as 'non-value adding' is a value judgement which to date has been largely unexamined. Green (Proceedings IGLC., Vol. 7 (1999)) challenged the concept of lean construction and examined the human cost of lean production but did not specifically focus on non-value adding activity. This study aims to start to fill this gap in knowledge through a review of the literature and analysis of three long, unstructured interviews - extended conversations - with construction site managers to explore the activity that has been described as 'non-value adding'. The findings indicate that the respondents would like to be able to work more efficiently, particularly if this would shorten their working day. However, during 'non-value adding' time (for instance driving to and from site, taking breaks, walking around site to pick up material) the interviewees plan upcoming tasks and evaluate completed work. In addition, 'non-value adding' time allows for team building and friendship formation which helps to build mental resilience, which is of genuine value when we consider the mental health crisis amongst construction workers. There is clearly room for improvement in site efficiency of construction workers, however the impact on those workers of efficiency measures should be clearly understood before being imposed to avoid unforeseen adverse consequences. This paper contends that 'non value adding' activity is not without value, and that a more appropriate term should be found.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | lean construction; mental health; productivity; resilience. |
| Index terms: | mental health, construction worker, movement, efficiency, industry 4.0, lean construction, manager, team building, interview, lean production, productivity, construction site |
| Subjects: | performance management, management, manufacturing engineering, building construction, health conditions and diseases, data collection methods, practitioner, health behaviours and lifestyles, work location, technology adoption |
| Topics: | Digital Applications, Quality Management, Site Management, Organizational Design, Business Strategy, Health and Safety, Research Practice, Engineering Principles, Roles and Professions |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here