Edison, J C and Singla, H K (2020) Development of a scale for factors causing delays in infrastructure projects in India. Construction Economics and Building, 20(1), pp. 36-55. ISSN 2204-9029
Abstract
The objective of the paper is to develop a validated scale to measure the factors that cause delays in infrastructure projects. The study employed a standard three phase scale development procedure of Churchill (1979) which was augmented subsequently by Nunnally, Bernstein and Berge (1994) and Prakash and Phadtare (2018). In phase one, 73 factors that cause delays were identified, which were reduced to 45 based on literature review and expert opinions. These 45 factors were subjected to an exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) in phase two and three, respectively, to refine and establish convergent, discriminant and nomological validity of the scale. The study confirms that delays in infrastructure projects happen due to six factors, i.e., Contractor Related Factors (CON); Consultant Related Factors (CS); External Factors (EX); Labour Related Factors (LR); Material Related Factors (MT) and Design Related Factors (DJ). The study is particularly useful for the firms engaged in the development of infrastructure projects globally, as it identifies and ranks the factors that cause delays in a project. However, the study being confirmatory in nature only confirms the grouping of factors causing delays and is also limited by the possibility of sampling error.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | exploratory factor analysis; infrastructure construction; cost overrun; exploratory factor analysis; confirmatory factor analysis; delay |
| Index terms: | exploratory factor analysis, scale development, literature review, cost overrun, validity, confirmatory factor analysis, sampling, India, infrastructure construction, infrastructure project |
| Subjects: | statistical analysis, infrastructure and transport systems, measurement and scaling, Geography, civil engineering, financial and cost management, data analysis and analytics, evaluation and assessment methods, data collection methods |
| Topics: | Research Practice, Geographical Context, Engineering Principles, Cost Management |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here