The design and construction of public service building in developing rural regions during the post COVID-19 period: Cased on a Chinese village centre

Zhu, K; Xiang, Y; Bu, J and Zhang, H (2021) The design and construction of public service building in developing rural regions during the post COVID-19 period: Cased on a Chinese village centre. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Abstract

The spread of COVID 19 has caused an increasing demand for public medical room. Cases of Chinese Huoshenshan Hospital and mobile cabin hospitals proved the effectiveness of constructing emergent medical buildings. However, these cases, usually with strict requirements on technology and infrastructure, are hard to implement in developing rural regions. Therefore, there is an urgent need for adapting industrial construction to the rural situation. This research introduced an adaptive approach for rural projects delivery during COVID-19. It is based on a longitudinal case study, recording and analysing the construction process of a village centre in Jiangsu, China, from 2019 to 2020. By comparing the construction process of actual operation and traditional method, the advantages in a shorter building period and lower labour density were verified. This research pointed out neglected risks in developing countries and provided a practical construction approach in these areas. It supported the prevention of COVID-19 global wide.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: public service building; rural regions; post-COVID 19; construction design
Index terms: effectiveness, design and construction, prevention, case study, COVID-19, density, industrial construction, developing country, China, construction process
Subjects: health risk and incident analysis, performance management, Geography, development economics, data collection methods, financial risk, building construction, analytical methods, contractual arrangements
Topics: Site Management, International Construction, Research Practice, Engineering Principles, Quality Management, Procurement, Cost Management, Geographical Context, Health and Safety, Urban Studies
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here