Picking up where we left off: A 'temporary' safety culture

Aboagye-Nimo, E; Painting, N and Piroozfar, P (2024) Picking up where we left off: A 'temporary' safety culture. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Abstract

Construction of temporary structures e.g. events sector can be argued to present unconventional or extraordinary challenges than those encountered in traditional construction projects. Conventional construction projects generally have longer service life and construction timeline. The confined duration of construction projects in this sector, however, may result in little time for the steady establishment and development of a strong safety culture. This is partly because of the seasonal nature of the industry but also the relatively short duration on a particular site. The aim of this paper is to critically examine the views of construction professionals who work within the events industry to help better understand the nature of their safety cultures. In-depth interviews were conducted with experts engaged in construction, and health and safety in the events industry. Key findings indicate that core teams are maintained to ensure continuity of positive safety cultures. Similar to conventional construction projects, communication is vital to site safety. Furthermore, derigging or disassembly in this sector is one aspect that presents many safety concerns on site which are less noticed and less researched.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: events industry; health and safety; safety and hazards; temporary works
Index terms: temporary work, construction project, service life, safety culture, health and safety, construction professional, duration, traditional construction, interview, disassembly
Subjects: data collection methods, asset management, operations management, production management, heritage and conservation, project controls, professional development, health safety and environment
Topics: Research Practice, Health and Safety, Site Management, Time Control, Design Practice, Business Strategy, Information Management, Project Management
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here