Making sense of multi-actor social collaboration in building information modelling Level 2 projects: A case in Malaysia

Noor, R N H R M; Ibrahim, C K I C and Belayutham, S (2021) Making sense of multi-actor social collaboration in building information modelling Level 2 projects: A case in Malaysia. Construction Economics and Building, 21(4), pp. 89-114. ISSN 2204-9029

Abstract

Despite the diversity of thinking among the scholars on building information modelling (BIM) collaboration, there is a paucity of studies that capture the dimension of social collaboration in BIM projects. This study attempts to develop a comprehensive understanding on the key attributes of multi-actor social collaboration in BIM projects through the experience of practitioners in BIM-Level 2 construction project. The success of multi-actor social collaboration has been investigated through structured interviews with 22 BIM practitioners in a BIM-Level 2 project based on an established theoretical framework of social collaboration. The findings indicted that relationship-oriented attributes; relational contracts BIM execution plan; guideline, standard and work process manual approaches; employer information requirement (EIR); understanding roles and leadership; commitment from top management; resources; training, team building workshop and awareness program; coordination; and understanding on the theoretical knowledge of BIM are of importance towards multi-actor social BIM collaboration. This study acknowledges that the success of multi-actor social collaboration was influenced by the consolidation of many attributes, and it extends the dominant relationship between related attributes for multi-actor social collaboration based on the "best practice approach", which includes dominant-centric attributes (i.e., behaviour formation, procurement model and support principles). This research contributes to the body of BIM knowledge in the construction domain by focusing on what it takes to achieve greater social collaboration in BIM Level 2 projects.

Item Type: Article
Uncontrolled Keywords: building information modelling; Malaysia; social collaboration
Index terms: collaboration, best practice, execution plan, interview, practitioner, commitment, building information modelling, top management, social collaboration, workshop, key attribute, dimension, program, construction project, team building, coordination, Malaysia
Subjects: sociology, management, construction type, risk assessment, production management, Geography, practitioner, business, data collection methods, project controls, health monitoring assessment and metrics, psychology, information systems, software systems
Topics: Digital Applications, Time Control, Risk Management, Roles and Professions, Health and Safety, Project Management, Research Practice, Business Strategy, Construction Technology, Organizational Design, Urban Studies, Geographical Context
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here