Why is design-build commonly used in the public sector? An illustration from Hong Kong

Lam, E W; Chan, A P C and Chan, D W (2003) Why is design-build commonly used in the public sector? An illustration from Hong Kong. Construction Economics and Building, 3(1), pp. 53-62. ISSN 2204-9029

Abstract

The Design and Build (D&B) procurement method is one of the systems advocated to overcome inadequacies with the traditional procurement method. In recent years, this innovative procurement method has been put to practice in Hong Kong where a vast amount of infrastructure works is taking place. This paper aims to illustrate the applicability of design-build in the Hong Kong setting.As most D&B projects are undertaken by the public sector of Hong Kong, the main features of a public sector project and reasons for its wider use on D&B are fully examined in the paper. To further explore the benefits of D&B in actual practice, structured interviews have been conducted with clients, contractors and consultants running D&B projects in Hong Kong. Summary of major problems of running D&B projects from the previous study by the authors is also outlined. With the increasing use of D&B in the public sector of Hong Kong and worldwide, more research can be undertaken on the quantitative comparison of the traditional mode of procurement and how to carry out a D&B project successfully so as to develop a knowledge base for the D&B procurement method.

Item Type: Article
Uncontrolled Keywords: Hong Kong introdi jctlon; characteristics; construction; design-build; public sector
Index terms: Hong Kong, procurement method, interview, knowledge base, design and build, traditional procurement, public sector
Subjects: information systems, administrative law, contractual arrangements, Geography, data collection methods
Topics: Procurement, Research Practice, Geographical Context, Legal Issues, Digital Applications
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here