Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia

Ibrahim, F S; Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(3), pp. 21-42. ISSN 2204-9029

Abstract

Malaysia has seen the third wave of infection since the start of the global COVID-19 pandemic, with approximately 103 construction sites involving over 14,667 workers reported from April 2020 to February 2021. This has led to limited progress in construction projects or a complete halt, resulting in late project delivery. The purpose of this paper is to investigate the factors influencing the spread of COVID-19 and the strategies taken by the affected construction sites to mitigate the spread of the outbreak. The researchers adopted a case study approach with a multiple-case design and discusses the use of an in-depth interviewing method to collect rich data on the studied phenomenon. Data were collected from three construction sites. The sites were mixed development projects in nature and provided in-depth, rigorous, and robust information. Based on the results, two categories of factors influencing the spread of COVID-19 were established. These are primary and secondary factors, such as workers' mobilisation, uncontrolled movement of workers, and the limited practice of social distancing. Furthermore, evidence suggests that the strategies adopted to control the effects of the pandemic were a combination of government enforcement and initiatives taken by construction companies. This paper concludes that an early identification of the causes of the spread will enable appropriate implementation strategies to control the outbreak. This study is an attempt to present the experiences of one developing country as an example of a means of dealing with unexpected pandemics or other intractable diseases that can affect project delivery.

Item Type: Article
Uncontrolled Keywords: developing country; government; project delivery; Malaysia; case study; construction project; construction site
Index terms: construction site, strategy, construction company, Malaysia, developing country, pandemic, COVID-19, outbreak, case study, movement, enforcement, construction industry, implementation, project delivery, construction project, social distancing, evidence
Subjects: environmental health, industry analysis, health risk and incident analysis, management, development economics, health safety and environment, Geography, production management, work location, project delivery, contractual arrangements, organization, data collection methods, evaluation and assessment methods, health behaviours and lifestyles
Topics: Project Management, Geographical Context, Research Practice, Health and Safety, Business Strategy, Sustainability, Procurement, International Construction, Site Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here