Value through innovation in long-term service delivery: Facility management in an Australian PPP

Brewer, G; Gajendran, T; Jefferies, M; McGeorge, D; Rowlinson, S and Dainty, A (2013) Value through innovation in long-term service delivery: Facility management in an Australian PPP. Built Environment Project and Asset Management, 3(1), pp. 74-88. ISSN 2044-124X

Abstract

Purpose: Public-private partnerships (PPPs) and other innovative procurement mechanisms are frequently used to deliver both an asset and a public service over a protracted period. The value streams to the parties involved can be complex, but generally arise from the satisfactory provision of infrastructure that is fit for purpose throughout its life. This research aims to investigate the effectiveness of the facility management (FM) function in delivering long-term value to both the client and consortium. Design/methodology/approach: This paper describes a case study of a PPP in Australia that delivered social infrastructure in multiple locations to a state government. Drawing upon multiple perspectives from within the consortium, it utilises inductive principles to identify the influences on value generation through innovation by the FM function. Findings: The ability of an Australian FM contractor to provide value within a PPP context has been shown to reflect some of the attributes described in literature. However, the extent of innovation, especially in the design and construction phases, has been limited by organisational history and capability, and relational and contextual issues. Originality/value: This research highlights a flaw in the rhetoric relating to PPP delivery, namely the disconnection between the asset delivery and service delivery phases, which stifles the consortium's capacity to innovate and maximise value. It reveals a set of influences that both resonate with the literature and plausibly explain the suboptimal performance of the FM function within an Australian PPP. By using highly iterative analysis leading to within-case generalisability, it provides a robust basis for wider investigation of the problem.

Item Type: Article
Uncontrolled Keywords: Australia; facility management; PPP; service delivery
Index terms: Australia, value generation, drawing, partnership, case study, service delivery, consortium, history, design and construction, effectiveness, investigation, value stream, methodology
Subjects: service delivery, Geography, research methods, performance management, partnership management, data collection methods, business, contractual arrangements, financial and cost management, architectural and construction history, technical documentation
Topics: Procurement, Stakeholder Management, Research Practice, Project Management, Geographical Context, Cost Management, Value Management, Quality Management, Design Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here