Abstract

Purpose - The purpose of this paper is to investigate relational practices that can improve construction project outcomes in Malaysia. Design/methodology/approach - Based on the literature review, a questionnaire was designed containing 14 relational practices that were identified and grouped under five relational norms. Using a survey questionnaire, data were collected from clients, consultants and contractors in Malaysia’s construction industry. In-depth interviews were conducted to validate the statistical findings. Findings - When contracts are adjustable to address uncertainties, the projects concerned have better cost and quality outcomes. A better schedule outcome is correlated with coordinating and monitoring plans jointly. Open communication and sharing trustworthy project information have been found to produce better client-consultant and consultant-contractor relationships at the end of a project. When parties maintain a social relationship outside of a project, relationships between clients, contractors and consultants also improve significantly. Research limitations/implications - The findings are not easily generalisable due to the relatively small sample size, low response rate and the data being collected from only three regions in Malaysia. Practical implications - Clients need to take the lead in adopting relational practices, as these may give rise to warmer relationships and better project outcomes. Showing too much commitment and flexibility may harm the project schedule because of the frequent changes. Originality/value - This study found that the theory of relational contracting norms applies to Malaysia’s construction industry. The parties do not rely strictly on contract conditions but embrace role integrity, preserve relations and harmony to avoid relational conflict, and achieve their goals through proper means.

Item Type: Article
Uncontrolled Keywords: performance; time; relationship management; costing; quality; project management; project teams; relational contracting; project outcomes; clients; consultants; main contractors
Index terms: contract condition, Malaysia, interview, relational contracting, main contractor, survey, project outcome, sample size, integrity, literature review, commitment, questionnaire, construction project, monitoring, relationship management, methodology, project management, project team, norms, costing, construction industry
Subjects: control systems, practitioner, data collection methods, project completion, research design and methodology, contractual arrangements, data analysis and analytics, project delivery, psychology, production management, Geography, health safety and environment, project management theory and practice, management, contract structure, research methods, accounting and finance, industry analysis, sociology
Topics: Roles and Professions, Procurement, Cost Management, Health and Safety, Research Practice, Geographical Context, Project Management, Contract Administration, Organizational Design, Site Management, Human Resources
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here