Project feasibility analysis economic model for private investments in the renewable energy sector

Badasyan, N (2018) Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(2), pp. 215-230. ISSN 2044-124X

Abstract

Purpose: The purpose of this paper is to explore the financial and economic aspects of the renewable energy sector aiming to develop and present a project feasibility analysis model that allows the public sector to master plan socially beneficial infrastructure projects and to find financially viable options for private investments. This paper develops a general frame that can be harmonized to a certain project by applying relevant country specific schemes. Design/methodology/approach: The cost-benefit analysis (CBA) approach is used to develop relevant formulas aiming to compare the economic internal rate of return (EIRR) and financial internal rate of return (FIRR) of the possible investment options. The IRR method is used for the development of a platform that will allow comparing different project alternatives and choosing an optimal model for both public and private partners. A case study approach from Uzbekistan is used to highlight the implementation possibilities of the model based on a certain country example. Findings: This paper develops a decision-making frame allowing the public sector to find organizational options that provide economically viable projects and at the same time attract private investors in the latter. The designed map of possible benefits, costs and revenue mechanisms allows practitioners to analyze the economic and financial viability of the existing combinations by using the developed model. Practical implications: The developed model will allow the public sector to use the needed data on different possible design models in the developed formulas in order to identify the EIRR and FIRR of each option. Nevertheless, the application of the model will be possible after considering country specific options needed for CBA. The private sector can use the model to identify the financially acceptable options for the investments. Originality/value: The paper provides the decision makers with a sound tool to identify the possible combinations of the options to conduct a relevant project with private investments in the renewable energy sector and to choose the model that generates the highest social welfare.

Item Type: Article
Uncontrolled Keywords: infrastructure economics; infrastructure finance; infrastructure management; PPP; project feasibility analysis; renewable energy
Index terms: public sector, revenue, private sector, financial viability, economic model, platform, design model, case study, infrastructure management, project feasibility, investor, private investment, renewable energy, option, infrastructure project, Uzbekistan, implementation, practitioner, methodology, decision-making
Subjects: design process, infrastructure engineering, digital design, Geography, research methods, infrastructure and transport systems, industry analysis, administrative law, sociology, decision analysis, practitioner, value management, data collection methods, economic analysis, contractual arrangements, energy systems, business management, modelling and simulation
Topics: Engineering Principles, Project Management, Geographical Context, Research Practice, Business Strategy, Sustainability, Procurement, Stakeholder Management, Roles and Professions, Risk Management, Digital Applications, Legal Issues, Design Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here