Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X
Abstract
Purpose: A section of project management literature attributes overruns to estimators' deceit and delusion. An example of this is Flyvbjerg’s theorisation of strategic misrepresentation and optimism bias. To show that such a notion is not true entirely, the study elicits evidence relating to how costs of projects often fluctuate erratically as prices of construction materials change throughout contract cycle times. The purpose of this paper is to examine the causal relationships between persistent changes in prices of construction materials and project’s outturn costs. Design/methodology/approach: The authors obtained and analysed price data of construction materials published in a Nigerian national daily in the 16 years between 2000 and 2015. Additional data were obtained from a quantity surveying firm to validate the archival data on material prices, and to compare the firm’s robust database of project estimates and the corresponding outturn costs of specific building elements (detailed in the study). The goal of the analysis is to explore spontaneity and causal impact in the relationship between changes in prices of construction materials and project costs. Kolmogorov-Smirnov and Anderson-Darling tests were used to obtain the probability distributions of the causal relationships. Findings: Findings show disproportionate positive correlations between changes in material prices and outturn costs in Nigeria. An important dimension to this, however, is that although fluctuations in material costs often trigger variations to project costs, outturn price only accounts for about one-third of actual cost variability. Recovery of costs, not least profit making, under these conditions is a complex process. Originality/value: This paper concludes that dynamism in cost attributes is neither a deceit nor a delusion; understanding and tolerating them is not a systemic weakness, rather an essential key to project success and stakeholder satisfaction. Findings from the study also bring measured certainties to the transformation of variable costs into fixed price outcomes, an important consideration that will help contract estimators and project managers to understand the likelihood of fluctuation in material costs and how these might trigger variability in project costs.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction management; contract costs; costing; performance management; pricing; project management |
| Index terms: | estimate, optimism bias, costing, dimension, variability, project management, variation, methodology, construction material, stakeholder satisfaction, estimator, evidence, overrun, database, transformation, project cost, probability distribution, profit, Nigeria, performance management, recovery, quantity surveying firm, project success, pricing, project manager, actual cost |
| Subjects: | building materials, operations management, participation process, financial and cost management, health monitoring assessment and metrics, economic analysis, evaluation and assessment methods, profession, business, project controls, data management, cognitive psychology, statistical analysis, performance measurement, research methods, economics, accounting and finance, contractual condition, Geography, project management theory and practice |
| Topics: | Quality Management, Digital Applications, Contract Administration, Time Control, Geographical Context, Project Management, Research Practice, Engineering Principles, Cost Management, Business Strategy, Health and Safety, Roles and Professions, Stakeholder Management |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here