Kissi, E; Agyekum, K; Baiden, B K; Tannor, R A; Asamoah, G E and Andam, E T (2019) Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 9(3), pp. 364-382. ISSN 2044-124X
Abstract
Purpose: Monitoring and evaluation (M&E) of projects is a very important aspect of project execution and management. This is because proper M&E practices have a significant effect on the successful delivery of projects. The purpose of this paper is to examine the impact of project M&E practices on construction project success criteria. Design/methodology/approach: Structured questionnaires were used to solicit the views of project professionals in the Ghanaian construction industry. The questions were developed through critical review of literature and complemented with a pilot interview on the subject. This paper utilized a partial least square–structural equation modeling (PLS–SEM) to establish the impact of project M&E practices (constructs) on project success based on the hypothesis. Findings: Results showed that M&E practices had a positive statistical significant relationship with construction project success criteria. In addition, health and safety performance and project scope showed a strong significant relation with M&E practice, implying that, in developing countries, these two main constructs should be given critical attention in achieving project success. Practical implications: The findings of this study may be useful to organizations in determining M&E techniques that are relevant and contribute highly to project success. This may go a long way to increase productivity and accelerate the rate of successful project delivery. Originality/value: The application of rigorous analysis, PLS–SEM, gives a more reliable information on M&E practices that can ensure successful delivery of construction projects.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | condition monitoring; construction; criteria; evaluation; Ghana; projects; success |
| Index terms: | success criteria, interview, developing country, health and safety, project success, productivity, structural equation modelling, Ghana, methodology, construction project, project scope, monitoring, questionnaire, construction industry, partial least square, project monitoring, project delivery |
| Subjects: | scope management, control systems, data collection methods, project delivery, health safety and environment, Geography, production management, project management theory and practice, development economics, management, research methods, industry analysis, statistical analysis, assessment methods |
| Topics: | International Construction, Site Management, Research Practice, Project Management, Geographical Context, Business Strategy, Health and Safety, Procurement |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here