Training gaps in the adoption of building information modelling by Nigerian construction professionals

Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(3), pp. 399-411. ISSN 2044-124X

Abstract

Purpose: The opportunities that the building information modeling (BIM) mode of project delivery presents warrant the need for the construction professionals to be adequately trained on BIM technology and processes. The purpose of this paper is to assess the training gaps that exist between the perceived and expected knowledge of BIM practice among construction professionals in Nigeria. Design/methodology/approach: The study was carried out through a structured questionnaire survey administered on identifying training gaps among registered Nigerian construction professionals toward BIM adoption. Relevant information on the perceived and expected BIM mode of practices was systematically collected from 212 participants who are familiar with BIM concepts. The data generated were analyzed using descriptive statistics and gap analysis. Findings: Gap analysis was employed in determining the significance of BIM training gap for various practices among the construction professionals. The most significant gaps in BIM practice with gap analysis value>1 are the project review technique and clash detection for architectural practice. Among quantity surveyors, cost estimating, preparation of bills of quantities and project budgeting are the practice areas where there are significant training gaps in adopting BIM. For engineering practices, the gap analysis reveals a significant training gap in design creation and coordination, as-built-modeling, clash detection and space management. Research limitations/implications: The research is limited to the perception of the respondents on actual and ideal BIM practices, not considering the process workflow, facility requirements and other issues that revolve round BIM adoption and implementation. It is also limited to professionals in the industry, and further studies will be appropriate to address these limitations. Practical implications: The study reveals that there is a great need to meet the training gaps for BIM adoption in ensuring efficiency of construction project delivery. Originality/value: The gaps that exist between the actual and expected BIM training were statistically established.

Item Type: Article
Uncontrolled Keywords: building information modelling; construction professionals; construction projects; gap analysis; Nigeria; training gap
Index terms: Nigeria, survey, construction project delivery, cost estimating, gap analysis, building information modelling, quantity surveying, efficiency, project budgeting, coordination, project delivery, statistics, workflow, bills of quantities, implementation, modelling, questionnaire, construction project, architectural practice, construction professional, methodology
Subjects: profession, data collection methods, business, mathematical modelling, contractual arrangements, cost planning, analytical methods, financial and cost management, project delivery, performance measurement, management, performance management, research methods, Geography, production management, professional development, project controls, information systems
Topics: Organizational Design, Time Control, Quality Management, Digital Applications, Procurement, Roles and Professions, Information Management, Engineering Principles, Project Management, Geographical Context, Research Practice, Business Strategy, Cost Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here