Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X
Abstract
Purpose: Traditionally, early-stage investment decisions on buildings purely based initial capital costs and simply ignored running costs and total lifecycle cost. This was basically due to the absence of estimating models that yield running costs at the early design stage. Often, when the design of a building, which is responsible for 10–15% of its total cost, is completed, 80% of the total cost is committed. This study aims to develop a building characteristic-based model, which is an early-stage determinant of running costs of buildings, to predict the running costs of commercial buildings. Design/methodology/approach: A desk study was carried out to collect running costs data and building characteristics of 35 commercial buildings in Sri Lanka. A Pareto analysis, bivariate correlation analysis and hedonic regression modelling were performed on collected data. Findings: According to Pareto analysis, utilities, services, admin work and cleaning are four main cost constituents, responsible for 80% of running costs, which can be represented by highly correlated building characteristics of building height, number of floors and size. Approximately 94% of the variance in annual running costs/sq. m is expressed by variables of number of floors, net floor area and working hours/day together with a mean prediction accuracy of 2.89%. Research limitations/implications: The study has utilised a sample of 35 commercial buildings due to non-availability and difficulty in accessing running cost data. Originality/value: Early-stage supportive running costs estimation model proposed by the study would enable construction professionals to benchmark the running costs and thereby optimise the building design. The developed hedonic model illustrated the variance of running costs concerning the changes in characteristics of a building.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | building characteristics; commercial buildings; design stage; hedonic regression; quantitative modeling; running costs |
| Index terms: | variance, building design, pareto analysis, capital cost, hedonic model, regression modelling, accuracy, utilities, building height, correlation analysis, estimation, methodology, commercial building, working hours, construction professional, running cost, Sri Lanka, lifecycle, design stage, determinant, modelling, investment decision, early design stage, cleaning, estimating |
| Subjects: | statistical analysis, building performance, measurement and scaling, professional development, design process, employment law, Geography, maintenance engineering, research methods, accounting and finance, project delivery, financial and cost management, analytical methods, economic analysis, architectural design, professional practice, quality control, risk assessment, construction type |
| Topics: | Geographical Context, Project Management, Research Practice, Engineering Principles, Information Management, Cost Management, Business Strategy, Construction Technology, Risk Management, Quality Management, Legal Issues, Design Practice |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here