Investigating the managerial "nuts and bolts" for the construction industry

Yap, J B H and Chow, I N (2020) Investigating the managerial "nuts and bolts" for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 331-348. ISSN 2044-124X

Abstract

Purpose: Managerial shortfalls can considerably undermine the delivery performance of construction projects. This paper appraises the project management essentials (PMEs) for successful construction project delivery. Design/methodology/approach: Following a detailed literature review, a questionnaire survey was developed encompassing 20 PMEs that were identified. An opinion questionnaire survey was used to facilitate data collection from key construction stakeholders in the Malaysian construction industry. The survey data were subjected to descriptive statistics and exploratory factor analysis. Findings: Findings indicated that the leading PMEs are competency of the project team, competency of project manager, good leadership, effective planning and control and realistic cost and time estimate. Spearman’s rank correlation tests affirmed a good agreement on the ranking of PMEs across stakeholder groups. The present study found that PMEs for construction have a total of four dimensions, namely: scope, communication and competence management; stakeholder commitment and collaborative engagement; construction time–cost planning and control; and environment, health, safety and quality management. Practical implications: The findings could potentially contribute to the development of appropriate project management best practices to address managerial shortfalls in Malaysia and other developing countries. Originality/value: This paper bridges the identified knowledge gap about critical managerial dimensions for successful project management in construction. The present study adds to the existing body of knowledge around this under-explored area in the construction management literature.

Item Type: Article
Uncontrolled Keywords: construction industry; factor analysis; overruns; performance management; project management; ranking
Index terms: questionnaire, factor analysis, construction project, competence, best practice, methodology, project management, construction time, project team, cost planning, statistics, dimension, estimate, body of knowledge, construction industry, quality management, project manager, exploratory factor analysis, Malaysia, developing country, performance management, survey, overrun, construction project delivery, literature review, commitment
Subjects: Geography, production management, project management theory and practice, personnel development, development economics, performance measurement, financial management, research methods, industry analysis, statistical analysis, quality assurance, project controls, profession, data collection methods, mathematical modelling, business, data analysis and analytics, knowledge management, health monitoring assessment and metrics, project delivery, financial and cost management, psychology
Topics: Roles and Professions, Research Practice, Geographical Context, Project Management, Information Management, Business Strategy, Cost Management, Health and Safety, Time Control, Organizational Design, Quality Management, Human Resources, International Construction
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here